Permit Review Detail
Review Status: Requires Resubmit
Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Permit Number - TC-MDP-0425-00228
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/01/2025 | Site Zoning | APPROVED | |||
| 05/05/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/22/2025 | ROW Engineering Review | REQUIRES RESUBMIT | EL RIO DR is under pavement moratorium until 01/08/2028, show new utility service connections in the ROW. | ||
| 05/05/2025 | Site Engineering | REQUIRES RESUBMIT | 1. The site does not have real property frontage onto the public right-of-way. Tucson Water has a remote meter policy that is newer than the creation of this parcel. I reached out to Tim Rowe from Tucson Water to get comments about the proposed development, his response: Tucson Water does have an issue with TC-MDP-0425-00228, 1476 W El Rio Dr. as the proposed parcel does not have real property frontage onto the public water main in El Rio Dr. The private water line proposed to serve 1476 is within a private easement across the property to the south. This is prohibited by Tucson Water's Remote Meter Policy No. IV-B.08, Eff. 07142009. The house to the east 1468 was allowed to use an easement, because water service to this address was started in 2003, prior to the effective date of Tucson Water's Remote Meter Policy. They could construct a new 4" public water main from El Rio Dr. to approximately 25' inside their property. It would need to be centered within a new water easement granted to the City of Tucson, over the existing 15' ingress/egress/utility private easement on the property to the south (1472) and extend approx. 30' inside the 1476 property. If they think they may want to do that, they should talk with Stephen Garcia of Tucson Water's New Services Section on the 1st Floor of the Public Works Building – 201 N Stone Av. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 04/30/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 04/17/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 04/30/2025 | Residential Building | REVIEW COMPLETED |