Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-MDP-0424-00467
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/25/2025 | Truss Design (Deferred Submittal) Express | NOT REQUIRED | Truss design review already performed and approved (see permit TC-MDP-1222-00129) | ||
02/26/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
02/25/2025 | Site Prep Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-MDP-0424-00467 ADDRESS/PARCEL: (9647 E HARKES DR TUCSON, AZ 85747) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Please submit the soils testing field report 2. Submit the post-installed epoxy anchors field test report, or state in Part C that the epoxy anchors were not utilized in this project. |
||
02/25/2025 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-MDP-0424-00467 ADDRESS/PARCEL: (9647 E HARKES DR TUCSON, AZ 85747) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Please submit the soils testing field report 2. Submit the post-installed epoxy anchors field test report, or state in Part C that the epoxy anchors were not utilized in this project. |
||
02/25/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
02/25/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
02/26/2025 | Pima County Wastewater (Deferred Submittal) Express | REVIEW COMPLETED | |||
02/25/2025 | Post-Tension Inspection (Deferred Submittal) Express | REVIEW COMPLETED |