Permit Number: TC-MDP-0226-00046
Parcel: 119217350

Address:
1721 W VALDEZ CT

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-0226-00046
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/17/2026 Residential Building APPROVED
03/16/2026 Residential Engineering APPROVED
03/13/2026 Fire New Construction NOT REQUIRED Please note this subdivision requires a fire hydrant.
Questions: patricia.shelton@tucsonaz.gov
03/25/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/25/2026 Residential Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Erick Bieber
Planning & Development Services Department – Zoning Review Section

PROJECT: TC-MDP-0226-00046
1721 W Valdez Ct, Tucson, AZ 85713
Residential Model Permit (1st Review)

TRANSMITTAL DATE: March 25th, 2026

This site is located in the R-1 zone (UDC 4.7.8). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.5 -.9.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Correct plans, as noted in the comments below, along with a response letter indicating how all Site Zoning comments were addressed.

1. (Comment) All easements are required to be shown on the site plan. Please draw and dimension the 10’ PUE at the front of the property.

2. (Comment) Provide the scale that was used for the site plan drawing.

The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code

For questions regarding Zoning comments, please contact me at: Erick.Bieber@tucsonaz.gov
03/11/2026 PDSD Application Completeness Express REVIEW COMPLETED
03/17/2026 ROW Engineering Review REVIEW COMPLETED VALDEZ CT is Private Street.
03/19/2026 TW New Development Review Fast REVIEW COMPLETED Tucson Water has no objection to the proposed SFR. If the 5/8-inch meter is existing, this comment may be disregarded. If a new water meter is needed, the owner shall contact Tucson Water New Services at the time service is requested. The meter may be tied to the existing 6-inch PVC water main, PN 084-2024.