Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-MDP-0225-00126
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/09/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please resubmit with concrete test field report for the correct address. Report supplied is for a different lot. FYI in the future, the city will be requiring all field reports to be separated and uploaded separately by inspection type. | ||
| 12/08/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | Please resubmit document titled "Rivendell 23 city documents" as the document submitted cannot be opened. |