Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-MDP-0225-00073
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/24/2025 | Concrete Installation Inspection (Deferred Submittal) Express | PENDING ASSIGNMENT | |||
| 09/24/2025 | Pima County Wastewater (Deferred Submittal) Express | PENDING ASSIGNMENT | |||
| 09/24/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | PENDING ASSIGNMENT | |||
| 09/24/2025 | Post-Tension Inspection (Deferred Submittal) Express | PENDING ASSIGNMENT | |||
| 09/24/2025 | Site Prep Inspection (Deferred Submittal) Express | PENDING ASSIGNMENT | |||
| 09/24/2025 | PDSD Application Completeness Express | REQUIRES RESUBMIT | Your submittal is incomplete, the Site prep field report was not included with the SIC-FINAL. In addition, P24WX01986 Sewer connection utility permit was already previously received and approved. The outstanding sewer condition is a different process for the sewer release also called "Public sewer acceptance." Sewer condition must be accepted and released by Pima County. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits. |