Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TC-MDP-0125-00014
Parcel: 105102630

Address:
4222 N LULU CT

Review Status: Requires Resubmit

Review Details: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1

Permit Number - TC-MDP-0125-00014
Review Name: SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/03/2025 Residential Building APPROVED
02/19/2025 Site Zoning APPROVED
02/13/2025 Fire New Construction NOT REQUIRED
02/19/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/18/2025 Site Engineering REQUIRES RESUBMIT TC-MDP-0125-00014
4222 N LULU CT

1. This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP) and a building elevation certificate. New construction buildings require a finished floor elevation (FFE) one foot above the base flood elevation (BFE).

Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home

Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”


Chris Arrington
chris.arrington@tucsonaz.gov
02/03/2025 PDSD Application Completeness Express REVIEW COMPLETED
02/07/2025 ROW Engineering Review REVIEW COMPLETED Roadway is private.