Permit Number: TC-FBB-1123-00006
Parcel: 14036006A

Review Status: Requires Resubmit

Review Details: FACTORY BUILT BUILDINGS v.6

Permit Number - TC-FBB-1123-00006
Review Name: FACTORY BUILT BUILDINGS v.6
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/15/2024 Commercial Building APPROVED
03/13/2024 Site Zoning APPROVED
03/15/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
03/14/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 The previous plan review comment pertaining to the temporary Generators is still not addressed. The Construction Staging Plan ‘AS-103’ still shows Generators utilized for the Temporary Trailers. Show complete electrical plans showing all wiring methods, OCPD’s for the panels ‘A’ and ‘B’.

2 Ref; Plan sheet E1.0. The Riser Diagram does not show an equipment Grounds included with the 3 #4/0 feeders for the Job Trailers, also not shown for the Tap conductors from the Ingrade Pull Box to the Job Trailer panels. NEC art 250.32(B). Please clarify.

Ref; 2018 IBC section 107.2.1, 2017 NEC.
02/29/2024 PDSD Application Completeness REVIEW COMPLETED