Permit Review Detail
Review Status: Requires Resubmit
Review Details: FACTORY BUILT BUILDINGS v.1
Permit Number - TC-FBB-1023-00003
Review Name: FACTORY BUILT BUILDINGS v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/30/2023 | Site Engineering | NOT REQUIRED | |||
11/09/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/09/2023 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. 1. Please submit the current State approved drawings and approval documentation for the construction trailer. |
||
11/06/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. Ref; Power Plan, Line Diagram. 1. Provide complete details, structural, footings, height above grade, etc. for the poles being utilized for installing the overhead Quadraplex cable. Also show XLP cable supports and transition from XLP overhead cable to 1/0 THHW conductors. 2. Type XLPE Quadraplex cable is normally used by utility companies and therefore is not recognized or identified per the NEC. Provide complete manufacturer cut sheets showing details of construction materials and all information, and or markings, amp ratings, printed on the cables as required per NEC art 310.120. Include recommended installation instructions per the manufacturer. NEC 110.3. 3. What is the electrical equipment designated with the letters ‘A’ and ‘B’ ? Disconnect switches? Breaker panels? Provide descriptions. If Breaker panels, provide complete panel schedules. 4. Show in detail how electrical equipment ‘A’ and ‘B’ is supported and or mounted. Pole mounted? Rack? Also, the 200 amp Residential panel. Panel schedule not required for the Trailor panel. 5. Is the Residential Panel an All-in-One type meter and panel. Please indicate. Provide a complete panel schedule. Ref; 2018 IBC section 108.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |
||
10/25/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-FBB-1023-00003 10100 E. Old Vail Rd. – PAD-36 Temporary Power for Construction Trailer (1st Review) TRANSMITTAL: September 22, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in PAD-36 (UDC 4.7.24). 1. A Temporary Use Permit is required to be submitted and approved prior to approval of this plan. TUP requirements can be found at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications. 2. The plan for the temp power shall be provided on an approved copy of the development package sheet, 25. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
10/23/2023 | PDSD Application Completeness | REVIEW COMPLETED |