Permit Review Detail
Review Status: Requires Resubmit
Review Details: PERMANENT MODULAR v.3
Permit Number - TC-FBB-0925-00114
Review Name: PERMANENT MODULAR v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/14/2026 | Commercial Electrical - Standard | APPROVED | |||
| 05/07/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/07/2026 | Site Engineering - Standard | REQUIRES RESUBMIT | Site Engineering Review TC-FBB-0925-00114 5301 S PARK AV Description: Water Kiosk Site Engineering comments are as follows: 1. This commercial building permit cannot be approved until the associated development package, TD-DEV-1125-00290, is approved by all reviewers. UDC Article 3.3.3.G.7.a 2. Ensure that the permit submittals match. Re-submit this permit once the above-mentioned DP is approved by all reviewers. To re-submit, visit the Tucson Development Center Online at: https://tdc-online.tucsonaz.gov/#/home The instructions for resubmittal can be found at: Revisions and Resubmittals Engineering Associate: Ryan Insalaco ryan.insalaco@tucsonaz.gov |
||
| 05/06/2026 | Site Zoning - Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-FBB-0925-00114 - TD-DEV-1125-00290 5301 S. Park Ave. Tucson, AZ 85706 New water vending kiosk (2nd Review) TRANSMITTAL DATE: 5/6/2026 The site is in the C-2 zone (UDC 4.7.21). Food and beverage sales is an allowed use in this zone. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Site Zoning has reviewed the building plans for compliance with the associated Development Package (DP) TD-DEV-1125-00290. It is acknowledged the proposed awning encroaches into the minimum required street setback however please draw, label, and dimension the setback from the property line to the awning and from the property line to the new building to ensure compliance with UDC 6.4.5.D.2. If the minimum required street setback cannot be met, a Design Development Option (DDO) will be required however those comments cannot be made since the setbacks are not accurately drawn on the site plan. Site zoning is unable to approve this permit until the associated DP has been approved by all reviewers. 2. Comment: Additional comments may be forthcoming based on responses to zoning comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 04/08/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |