Permit Number: TC-FBB-0725-00099
Parcel: 12416158A

Address:
1050 S PARK AV

Review Status: Requires Resubmit

Review Details: FACTORY BUILT BUILDINGS v.1

Permit Number - TC-FBB-0725-00099
Review Name: FACTORY BUILT BUILDINGS v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/07/2025 Commercial Building APPROVED
07/29/2025 Site Engineering NOT REQUIRED
08/13/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/13/2025 Commercial Electrical REQUIRES RESUBMIT Commercial Electrical Review TC-FBB-0725-00099 (1050 S PARK AV TUCSON, AZ 85719)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Provide electrical load calculations, for the Main Service and sub-panel, Per NEC 220.40.
2. Provide a complete line diagram, NEC 110.2, 2018 IBC 107.1.
3. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300.
4. Provide an electrical riser diagram, 2017 NEC 230.9. Notate the grounding and bonding method, 2017 NEC 250.20(B), 250.24, 250.30(A)(4). Metallic gas lines must be bonded and not be used as the primary grounding method, 2017 NEC 250.50, 250.52(B)(1).


Contact Jeremy Hamblin with any questions: building_official@tucsonaz.gov
08/06/2025 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-FBB-0725-00099 - TZ-PMT-0725-00079 -
TC-COM-0125-00197 - TD-DEV-0125-00008
1050 S PARK AV. – I-1
Temp construction trailer (1st Review)

TRANSMITTAL: August 6, 2025

Provide a detailed response letter with your next submittal that clearly shows how you have addressed all Zoning comments.

This site is located in the I-1 zone (UDC 4.7.29). Residential Care Services: Shelter Careis an approved use in the zone (UDC Table 4.8-5), subject to Use Specific Standards 4.9.7.J.1, 3.d, .4, .5, .6, and 4.9.13.Q.

1. Until Temporary Use Permit. (TUP) TZ-PMT-0725-00079 is approved by all review agenices Zoning cannot approve ths permit.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
08/02/2025 Fire New Construction REVIEW COMPLETED
07/23/2025 PDSD Application Completeness Express REVIEW COMPLETED