Permit Review Detail
Review Status: Requires Resubmit
Review Details: FACTORY BUILT BUILDINGS v.1
Permit Number - TC-FBB-0725-00097
Review Name: FACTORY BUILT BUILDINGS v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2025 | Commercial Building | APPROVED | |||
| 07/25/2025 | Site Engineering | APPROVED | |||
| 07/25/2025 | Site Zoning | APPROVED | |||
| 07/25/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/17/2025 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-FBB-0725-00097 (8750 E GOLF LINKS RD TUCSON, AZ 85730) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. The temporary power must be included as part of the building permit ( TC-COM-0524-00902) as a revision. This FBB permit can cover the installation of the structure itself, but the temp power needs to be included on the building permit. >>> Include the following information on the revised plans. 2. Provide a complete line diagram, NEC 110.2, 2018 IBC 107.1. 3. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300. 4. Provide an electrical riser diagram, 2017 NEC 230.9. Notate the grounding and bonding method, 2017 NEC 250.20(B), 250.24, 250.30(A)(4). Metallic gas lines must be bonded and not be used as the primary grounding method, 2017 NEC 250.50, 250.52(B)(1). Contact Jeremy Hamblin with any questions: building_official@tucsonaz.gov |
||
| 07/20/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 07/11/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |