Permit Review Detail
Review Status: Requires Resubmit
Review Details: MANUFACTURED/MOBILE/PARK MODEL HOME v.1
Permit Number - TC-FBB-0226-00012
Review Name: MANUFACTURED/MOBILE/PARK MODEL HOME v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/12/2026 | Residential Building | APPROVED | |||
| 02/18/2026 | Residential Zoning | APPROVED | |||
| 03/24/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/13/2026 | Residential Engineering | REQUIRES RESUBMIT | Permit Activity Number: TC-FBB-0226-00012 (1st Review) Project: Installation of manufactured home – AE Floodplain Location: 1302 W AJO WY Unit: UNIT 97 Review Date: 2/13/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Site Engineering Review Comments: 1. This site located at 1302 W AJO WY Unit: UNIT 97 is located within both a FEMA AE floodplain. As this property is located within delineated/known floodplains, it will be required that this project follow floodplain regulations and development guidelines. a. It will be required that a “Floodplain use (FPU) permit with Elevation Certificate” be submitted and the elevation certificate process be started for this proposed new home prior to final Site Engineering approval to permit TC-FBB-0226-00012. b. It should be noted that the FPU permit is an entirely separate permit (Not for construction) that can be submitted for within the “sub-records” tab of this permit through TDC online. 2. It was found that the base flood elevation (BFE) for the proposed house is 2397.1 FT NAV88. This will require a minimum finished floor elevation of 2398.1 FT NAV88. a. For the submission of the FPU permit and resubmission of the building permit, please submit the construction plans with a general note that states “New home to be built to a Finished Floor Elevation of 2398.10” FOR PERMIT RESUBMISSION, IT IS REQUIRED THAT: Corrected/Revised Plan set and a detailed response letter document that clearly shows how you addressed all of Site Engineering’s and other reviewers’ comments for the completed review cycle. If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 03/24/2026 | Landfill | REVIEW COMPLETED | Subject property is outside of landfill ordinance requirement. | ||
| 02/11/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |