Permit Number: TC-FBB-0225-00016
Parcel: 13323164A

Review Status: Requires Resubmit

Review Details: FACTORY BUILT BUILDINGS v.2

Permit Number - TC-FBB-0225-00016
Review Name: FACTORY BUILT BUILDINGS v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2025 Commercial Building APPROVED
04/04/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/25/2025 Commercial Electrical REQUIRES RESUBMIT Commercial Electrical Review TC-FBB-0225-00016 (7150 E SPEEDWAY BL TUCSON, AZ 85710)
2nd Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Residential Code (IRC), 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).

>>> The following comments were not addressed.

1. Show the location of the panel on the Electrical Plan with clear working space compliance, 2017 NEC 110.26(A)

2. Provide an electrical riser diagram, 2017 NEC 230.9. Notate the grounding and bonding method, 2017 NEC 250.20(B), 250.24, 250.30(A)(4). Metallic gas lines must be bonded and not be used as the primary grounding method, 2017 NEC 250.50, 250.52(B)(1).

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
03/28/2025 Site Engineering REQUIRES RESUBMIT See zoning comments
03/31/2025 Site Zoning REQUIRES RESUBMIT Until TUP TZ-PMT-0325-00016 has been approved Zoning cannot approve this permit
03/24/2025 Fire New Construction REVIEW COMPLETED
03/20/2025 PDSD Application Completeness Express REVIEW COMPLETED