Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEMOLITION v.1
Permit Number - TC-DMO-1026-00194
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/03/2026 | Site Engineering Fast | APPROVED | RE: comments in TE-FPU-1026-00435 | ||
| 10/28/2026 | Site Zoning Fast | APPROVED | |||
| 11/03/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/29/2026 | Commercial Building Fast | REQUIRES RESUBMIT | Please submit a complete set of revised/corrected documents and a written response addressing each review comment and explaining how it was resolved. Please note that the original submittal was incomplete, and the review was based on the information provided. Additional comments may be issued upon subsequent review. 1. Asbestos Inspection and NESHAP Compliance: Please submit a written asbestos inspection and survey report prepared by a qualified asbestos inspector. The report shall identify the materials inspected, locations and quantities of any asbestos-containing materials (ACM), laboratory test results, and the areas affected by the proposed demolition or renovation. Include a written determination of whether the project requires a NESHAP Notification and Activity Permit from the Pima County Department of Environmental Quality (PDEQ). If required, provide the applicable PDEQ permit and notification documentation before work begins. Reference: 2024 IBC Section 107.2.1; Pima County Code Title 17; 40 CFR Part 61, Subpart M. <Link url="https://www.pima.gov/applicability" title="PDEQ Asbestos NESHAP Applicability Requirements Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 10/29/2026 | Fire New Construction Express | REVIEW COMPLETED | |||
| 10/27/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |