Permit Number: TC-DMO-0726-00121
Parcel: 112071050

Address:
2531 N TREAT AV

Review Status: Requires Resubmit

Review Details: DEMOLITION v.1

Permit Number - TC-DMO-0726-00121
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/21/2026 Historic Fast APPROVED The documents submitted in compliance with the City of Tucson Ordinance 10776 are sufficient. Project not in an HPZ or National Register.No further historic review required.
Contact Michael.Taku@tucsonaz.gov
07/17/2026 Residential Engineering Express NOT REQUIRED
07/21/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/17/2026 Residential Zoning Express REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Erick Bieber
Planning & Development Services Department – Zoning Review Section

PROJECT: TC-DMO-0726-00121
2531 N Treat Ave, Tucson, AZ 85716
Residential Demolition Permit

TRANSMITTAL DATE: July 16th, 2026

This site is located in the R-2 zone (UDC 4.7.9).

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Correct plans, as noted in the comments below, along with a response letter indicating how all Site Zoning comments were addressed.

1. (Comment) The site plan provided is not sufficient. Please mark the structure or structures that will be demolished with an ‘x’.

The Unified Development Code (UDC) can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code

For questions regarding Zoning comments, please contact me at: Erick.Bieber@tucsonaz.gov
07/20/2026 Fire New Construction Express REVIEW COMPLETED
07/16/2026 PDSD Application Completeness Express REVIEW COMPLETED
07/17/2026 Residential Building Fast REVIEW COMPLETED An inspection shall be called prior to building demolition to verify that all utilities to include electrical, fuel, water & waste connections have been disconnected & secured. Upon successful verification that the utilities have been secured, the inspector shall record a partial approval and enter a note requesting the applicant recall the inspection item once the structure is demolished & the site cleaned up.

Upon successful verification that the structure has been removed, that the utilities remain secured & that the site is left in a safe & clean condition, the inspection items may be approved and the permit closed.