Permit Number: TC-DMO-0526-00086
Parcel: 119045170

Address:
3650 S 9TH AV

Review Status: Requires Resubmit

Review Details: DEMOLITION v.1

Permit Number - TC-DMO-0526-00086
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/27/2026 Historic Fast APPROVED
05/28/2026 Residential Engineering Express NOT REQUIRED
05/28/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/27/2026 Residential Zoning Express REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Roxanne Johnston
Planner

PROJECT: TC-DMO-0526-00086
3650 S 9th Av., Tucson, AZ 85713
Demo All Structures (1st Review)

TRANSMITTAL DATE: 05/27/2026

This site is located within the R-2 Zone (UDC 4.7.9). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Correct plans, as noted in the comments below, along with a response letter indicating how all Site Zoning comments were addressed.

1. Until the Historic Review has been completed, Site Zoning is unable to approve this permit.

2. Please provide a response letter with the next submittal materials.

3. Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted for the next review.

If you have any questions about this transmittal, please contact Roxanne Johnston at roxanne.johnston@tucsonaz.gov .
05/28/2026 Fire New Construction Express REVIEW COMPLETED
05/27/2026 PDSD Application Completeness Express REVIEW COMPLETED
05/27/2026 Residential Building Fast REVIEW COMPLETED An inspection shall be called prior to building demolition to verify that all utilities to include electrical, fuel, water & waste connections have been disconnected & secured. Upon successful verification that the utilities have been secured, the inspector shall record a partial approval and enter a note requesting the applicant recall the inspection item once the structure is demolished & the site cleaned up.

If the permit requires the septic tank to be pumped, crushed & filled with sand, compliance shall be confirmed in the field during the inspection.

Upon successful verification that the structure has been removed, that the utilities remain secured & that the site is left in a safe & clean condition, the inspection items may be approved and the permit closed.