Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-DMO-0525-00107
Parcel: 132190620

Review Status: Approved

Review Details: RESTAMP - DEMOLITION v.1

Permit Number - TC-DMO-0525-00107
Review Name: RESTAMP - DEMOLITION v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
06/13/2025 Residential Building Express APPROVED An inspection shall be called prior to building demolition to verify that all utilities to include electrical, fuel, water & waste connections have been disconnected & secured. Upon successful verification that the utilities have been secured, the inspector shall record a partial approval and enter a note requesting the applicant recall the inspection item once the structure is demolished & the site cleaned up.

If the permit requires the septic tank to be pumped, crushed & filled with sand, compliance shall be confirmed in the field during the inspection.

Upon successful verification that the structure has been removed, that the utilities remain secured & that the site is left in a safe & clean condition, the inspection items may be approved and the permit closed.
06/13/2025 Bldg Permits - Post Review Express REVIEW COMPLETED