Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEMOLITION v.1
Permit Number - TC-DMO-0525-00090
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/16/2025 | Commercial Building Fast | APPROVED | |||
| 05/19/2025 | Site Zoning Fast | APPROVED | |||
| 05/19/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/15/2025 | Site Engineering Fast | REQUIRES RESUBMIT | This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 05/15/2025 | Fire New Construction Express | REVIEW COMPLETED | |||
| 05/19/2025 | Historic Express | REVIEW COMPLETED | Minor architectural documentation provided and reviewed for completeness. | ||
| 05/15/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |