Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEMOLITION v.1
Permit Number - TC-DMO-0524-00107
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/31/2024 | Site Zoning | APPROVED | |||
05/31/2024 | Site Engineering | NOT REQUIRED | |||
05/31/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/24/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 5/24/2024 7:36:42 AM 1. Provide structural scope of work and depict them on plan. Any structural components to be removed? Any load bearing wall, headers, etc.? Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 5/24/2024 7:37:52 AM 1. Sheet G0.102 states occupancy group R-2 (multi-sleeping units) but project description is to remove existing fitness space. AD.030 doesn’t specify the existing space. Show accurate occupancy group per 2018 IBC. (A-3?) 2. Label adjacent occupancy group. Is there a restaurant to be demolished in scope? Is adjacent Hawaiian BBQ? 3. Sheet AD.030 – Label all existing rooms in scope. Fitness, storage, etc.? Couple of rooms without doors are shown (West of plan). 4. What is the demolition scope of work for ceiling components? Reflected ceiling plan missing to clarify scope of work. 5. Provide life safety plan. How does this scope affect existing egress system? 2018 IBC 3310.2 – Means of egress and required accessible means of egress shall be always maintained during construction, demolition, remodeling or alterations and additions to any building. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 5/24/2024 7:37:13 AM 1. Provide mechanical scope of work and depict them on plan. AD.030 shows existing mechanical and plumbing shafts. What are the mechanical components the remains or removed? Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 5/24/2024 7:37:34 AM 1. Provide electrical scope of work and depict them on plan. What are the remaining or removed power and light fixtures? Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 5/24/2024 7:37:01 AM 1. Provide plumbing scope of work and depict them on plan. AD.030 shows existing mechanical and plumbing shafts. What are the plumbing components the remains or removed? |
||
05/23/2024 | Fire New Construction | REVIEW COMPLETED | |||
05/23/2024 | PDSD Application Completeness | REVIEW COMPLETED |