Permit Number: TC-DMO-0326-00049
Parcel: 11515189B

Address:
1707 N 14TH AV

Review Status: Requires Resubmit

Review Details: DEMOLITION v.1

Permit Number - TC-DMO-0326-00049
Review Name: DEMOLITION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/12/2026 Historic Fast APPROVED Historic documentation fulfilled
03/16/2026 Residential Zoning Express APPROVED
03/16/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/11/2026 Residential Engineering Express REQUIRES RESUBMIT Site Engineering Review

TC-DMO-0326-00049
1707 N 14TH AV

Description: “remove old house in preparation for new building”

Site Engineering comments are as follows:

1. This project lies within an estimated flood hazard zone. A floodplain use permit (FPU) will be required. Site Engineering cannot approve this permit without an issued floodplain use permit. The floodplain use permit is a separate submittal which can be found in the sub-records of this permit on the TDC Portal.

To re-submit, visit the Tucson Development Center Online at:
https://tdc-online.tucsonaz.gov/#/home

The instructions for resubmittal can be found at: Revisions and Resubmittals

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
03/11/2026 Fire New Construction Express REVIEW COMPLETED
03/11/2026 PDSD Application Completeness Express REVIEW COMPLETED
03/11/2026 Residential Building Fast REVIEW COMPLETED An inspection shall be called prior to building demolition to verify that all utilities to include electrical, fuel, water & waste connections have been disconnected & secured. Upon successful verification that the utilities have been secured, the inspector shall record a partial approval and enter a note requesting the applicant recall the inspection item once the structure is demolished & the site cleaned up.

If the permit requires the septic tank to be pumped, crushed & filled with sand, compliance shall be confirmed in the field during the inspection.

Upon successful verification that the structure has been removed, that the utilities remain secured & that the site is left in a safe & clean condition, the inspection items may be approved and the permit closed.