Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: RESTAMP - DEMOLITION v.1
Permit Number - TC-DMO-0325-00052
Review Name: RESTAMP - DEMOLITION v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/06/2025 | Residential Building Express | APPROVED | An inspection shall be called prior to building demolition to verify that all utilities to include electrical, fuel, water & waste connections have been disconnected & secured. Upon successful verification that the utilities have been secured, the inspector shall record a partial approval and enter a note requesting the applicant recall the inspection item once the structure is demolished & the site cleaned up. If the permit requires the septic tank to be pumped, crushed & filled with sand, compliance shall be confirmed in the field during the inspection. Upon successful verification that the structure has been removed, that the utilities remain secured & that the site is left in a safe & clean condition, the inspection items may be approved and the permit closed. |
||
| 05/07/2025 | Bldg Permits - Post Review Express | REVIEW COMPLETED | |||
| 05/06/2025 | Fire New Construction Express | REVIEW COMPLETED |