Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: In Review
Review Details: DEMOLITION v.1
Permit Number - TC-DMO-0126-00018
Review Name: DEMOLITION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/03/2026 | Residential Building Fast | APPROVED | An inspection shall be called prior to building demolition to verify that all utilities to include electrical, fuel, water & waste connections have been disconnected & secured. Upon successful verification that the utilities have been secured, the inspector shall record a partial approval and enter a note requesting the applicant recall the inspection item once the structure is demolished & the site cleaned up. If the permit requires the septic tank to be pumped, crushed & filled with sand, compliance shall be confirmed in the field during the inspection. Upon successful verification that the structure has been removed, that the utilities remain secured & that the site is left in a safe & clean condition, the inspection items may be approved and the permit closed. |
||
| 02/03/2026 | Residential Engineering Express | NOT REQUIRED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Historic Fast | PENDING ASSIGNMENT | |||
| N/A | Residential Zoning Express | PENDING ASSIGNMENT | |||
| 02/03/2026 | Fire New Construction Express | REVIEW COMPLETED | |||
| 02/03/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |