Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEMOLITION v.2
Permit Number - TC-DMO-0125-00018
Review Name: DEMOLITION v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2025 | Site Zoning Fast | APPROVED | |||
| 02/25/2025 | Site Engineering Fast | NOT REQUIRED | |||
| 02/25/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/25/2025 | Commercial Building Fast | REQUIRES RESUBMIT | ACTIVITY NO. TC-DMO-0125-00018 ADDRESS/PARCEL: (7034 E BROADWAY BL TUCSON, AZ 85710) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. COMMENTS: You submitted a proposed floor plan along with this set of drawings. Did you apply for the wrong permit (you may have to apply for the correct permit)? If you are applying for a tenant improvement, please see the following comments. 1. A new certificate of occupancy will be issued. Provide a complete code analysis. Please provide the following: a. Occupant load calculation b. Occupancy Classification and Use c. Type of Construction d. Is fire sprinkler present e. If applicable, is fire alarm present f. Provide the required minimum plumbing fixtures calculation g. Depending on the occupant load a water fountain may be required (locate/label on your floor plan), water coolers can be substituted for drinking fountains per IBC 2902.1 and IPC 410.1 2. Restroom to comply to ICC A117.1 NOTE: fixture such as the sink cannot encroach into the required clear floor area around the water closet. At water closet, show the 60" W x 56" D clearance area on the floor per ANSI A117 Figure 604.3 Ensure no other fixtures are within this area. 3. A clear floor space complying with Section 305.3, positioned for forward approach, shall be provided at the lavatory. Lavatory shall be maximum 34 inches above floor to the higher of the rim or counter surface, faucets and soap dispenser shall have a reach depth of 11 inches per ANSI 606.5 Water supply and drain pipes under lavatories shall be insulated to protect against contact per ANSI 606.6 complying to clearances shown on Figure 606.3 ICC A117.1 Please provide drawings illustrating the above requirements. 4. Ensure that the facility is accessible complying to the ICC/ANSI A117.1 for both Employees and Customers. Provide drawings that illustrate the ANSI accessible counter at the Checkout in both height and width requirements per 2009 ANSI A117.1 Figure 904.3(B), work surface shall comply to the required 34 inch high counter surface and 36 inches wide area and the required leg clearance under the work surface per ICC A117.1 Please provide drawings illustrating the above requirements. 5. Accessible door opening shall be a minimum clear opening width of 32 inches. The clear opening width of doorways with swinging doors shall be measured between the face of the door and the stop, with the door open 90 degrees. Where a door opening includes two door leaves without a mullion, one leaf shall provide a minimum clear opening width of 32 inches. IBC 1010.1.1. Indicate these clear door openings on the floor plan at the front door, ramp door, breakroom door, storage door and toilet door. 6. At the front and back door, install sign - This Door To Remain Unlocked When This Space Is Occupied. IBC 1010.1.9.4 7. Please remove the steps at the ramp shown on the floor plan. Provide construction drawings for the wooden ramp along with the guardrail details/drawings. 8. Please provide on your drawing the solution to providing air supply to the new storage room. 9. Please resubmit. |
||
| 02/25/2025 | Commercial Electrical Express | REQUIRES RESUBMIT | 1. THE MEANS OF EGRESS WILL BE ILLUMINATED TO A LEVEL OF NOT LESS THAN ONE FOOT-CANDLE AT THE WALKING SURFACE AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED. IBC 1008.2.1 Locate/label the lighted exit sign, emergency light with back-up power as well as the fire extinguisher on the floor plan. 2. Existing doors to the existing restroom is being removed. This means the light switch is being removed and relocated to the new restroom door. The existing Breakroom counter being demolished has electrical that require removal. The new storage room requires new electrical for light and ventilation. The Checkout counter will also need power, communication/phone and data lines. The new product displays and the checkout counter may require light locations. Please submit an MEP professional registered in Arizona set of Electrical drawings that is sealed/signed/dated by the professional. |
||
| 02/25/2025 | Commercial Plumbing Express | REQUIRES RESUBMIT | 1.) The lavatory faucet shall be a metering faucet. The metering faucet shall dispense a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds for accessibility. Reference: Section 412.11, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. 2.) New plumbing fixtures are proposed such as a new lavatory in the Toilet room, new water heater and new Mop sink in the Break room. An existing bathtub is being removed, an existing sink in the toilet room is being removed and an existing sink in the breakroom is being removed. Submit a Sealed/Signed/ Dated by an MEP registrant licensed in Arizona set of Plumbing drawings. |
||
| 02/19/2025 | Fire New Construction Express | REVIEW COMPLETED | |||
| 02/18/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |