Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1225-02335
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/03/2026 Commercial Building Standard APPROVED
07/21/2026 Commercial Electrical Standard APPROVED Reviewed under Master Permit: Master Plan Set TC-COM-1225-02306/UNIT 1 FOR SHARED PLAN SET
07/30/2026 Commercial Mechanical Standard APPROVED
07/21/2026 Outdoor Lighting Standard NOT REQUIRED Reviewed under Master Permit: Master Plan Set TC-COM-1225-02306/UNIT 1 FOR SHARED PLAN SET
08/03/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/30/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Coordinate the drawings. A new 3” building drain connects to an existing 3” building drain on risers 5, 6, and 7/P3.1, but on P2.1, keynote #2 calls for the new 3” building drain to connect to an existing 4” building drain. [Initial comment: Verify the size of the existing first floor building drains shown in riser diagram, 6/P3.1. The plan drawings show 4” but the riser diagrams show 3” existing building drains. Reference: Section 107.2.1, IBC 2018.]
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
07/09/2026 PDSD Application Completeness Express REVIEW COMPLETED Master TC-COM-1225-02306 is in review