| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/20/2026 | Commercial Mechanical Standard | NOT REQUIRED | no mechanical work or modifications | ||
| 01/20/2026 | Water - PDSD Standard | NOT REQUIRED | |||
| 01/23/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/22/2026 | Commercial Building Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1225-02328 ADDRESS: (1145 E FORT LOWELL RD TUCSON, AZ 85719) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976. COMMENTS: 1. Please locate/label all the scuppers and overflows on the drawings. a. Show/label the downspouts on the drawings. b. NOTE: Water flows from downspout are not allowed to empty onto surfaces such as sidewalks, etc. Please see below. i. City of Tucson UDC (Unified Development Code) TSM (Technical Standard Manual) 7-01.4.1.E E. Sidewalks shall be flood free for all storm discharges of up to and including a ten-year frequency flood event. Drainage flowing across all pedestrian circulation paths shall be conveyed under the path for up and including the ten-year frequency flood events, except at street intersections, pedestrian crossings, and PAAL pedestrian crossings 2. PARAPET a. Provide coping sealing detail drawing at the top of the parapet. 3. BOTTOM OF WALL a. Provide detail drawing at the bottom of the wall. b. Ensure to depict the condition where it approaches earth/soil surface. c. Ensure to depict another condition where it approaches solid surfaces such as concrete sidewalk, etc. 4. VENEER a. Provide detail drawing depicting how the veneer is being attached to the existing walls to include moisture protection layers between existing wall and veneer, etc. b. Provide drawings depicting the veneer being installed at openings such as door and windows. 5. Please resubmit. |
||
| 01/08/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical/Outdoor Lighting review TC-COM-1225-02328 (1145 E FORT LOWELL RD TUCSON, AZ 85719) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). Electrical/Outdoor Lighting Review: Plans shall include (as necessary for scope of work), but may not be limited to items below: 1. Clarify all electrical and lighting relocations that may be happening, reference sheet A-1.0. Show new locations of all relocated electrical or lighting fixtures. Provide a basic electrical plan. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 01/20/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-1225-02328 ADDRESS/PARCEL: (1145 E FORT LOWELL RD TUCSON, AZ 85719) Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov 1. Please provide sufficient details of the cricket, scupper, and downspout (Sht A-1.0). Show the size, slopes, routing, and termination points for the roof drain and overflow roof drain leaders. Reference: Sections 1106 and 1108, IPC 2018. 2. Please clarify and show on the plans where the rainwater leaders will discharge in relation to the sidewalk. Primary rainwater leaders may not discharge onto a sidewalk. Reference: Section 7-01.4.1 E, Technical Standards Manual, Tucson Arizona Unified Development Code. |
||
| 01/08/2026 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Commercial Electrical/Outdoor Lighting review TC-COM-1225-02328 (1145 E FORT LOWELL RD TUCSON, AZ 85719) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). Electrical/Outdoor Lighting Review: Plans shall include (as necessary for scope of work), but may not be limited to items below: 1. Clarify all electrical and lighting relocations that may be happening, reference sheet A-1.0. Show new locations of all relocated electrical or lighting fixtures. Provide a basic electrical plan. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 12/31/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-1225-02328 Location: 1145 E FORT LOWELL RD Review Date: 12/31/2025 Site Engineering Comments: 1. This site located at 1145 E Fort Lowell RD resides within the Navajo Wash Floodplain which carries a FEMA AE designation. it will be required that a flood plain use (FPU) permit be submitted for review and approval for substantial improvement calculations. a. It should be noted that the FPU permit is an entirely separate permit that can be applied and submitted for within the “Sub-Records” tab of this commercial permit within TDC Online. 2. For the FPU permit please submit a cost estimate form that will break down the total cost into separate lines, separating labor, materials/equipment, and warranties/fees associated with the project. Ensure to have company/contractor letterhead on the document for proper documentation. This cost estimate will be used for substantial improvement calculations. The cost estimate should not include any site work related costs such as landscaping, parking area, etc. 3. It is required that the FPU permit be reviewed and approved prior to Site Engineering approval to permit TC-COM-1225-02328. If you have any questions or concerns, please contact |
||
| 01/23/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: TC-COM-1225-02328 1145 E. Fort Lowell Rd. Tucson, AZ 85719 Extend Parapet Walls and Add Foam Veneer (1st Review) TRANSMITTAL DATE: 1/23/2026 Comment: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. This site is located in the O-3 zone (UDC 4.7.15) and R-2 zone (UDC 4.7.9). 1. Comment: Clearly show the height of the wall with the proposed parapet from design grade on your site plan and elevation sheet. 2. Comment: Additional comments may be forthcoming based on responses to zoning comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 01/20/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/30/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |