Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-1225-02323
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/04/2026 | Commercial Plumbing Standard | APPROVED | |||
| 07/01/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/02/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-1225-02323 (3rd Review) Project New Fry's Fuel CANOPY Location: 9440 E BROADWAY BL Review Date: 6/2/2026 Reviewer: Marco Contreras – Engineering Associate Reviewer Contact Information: marco.contreras@tucsonaz.gov Site Engineering Comments: 1. Site Engineering has completed its review of the submitted plan set and cross-referenced it against the associated development package. However, Site Engineering is unable to grant final approval for Commercial Permit TC-COM-1225-02323 until the associated Development Package TD-DEV-0225-00061 has received full approval and has been issued. Please resubmit for final approval once the development package has been approved and issued by all applicable reviewers. |
||
| 06/08/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-1225-02323 - TD-DEV-0225-00061 9440 E. Broadway Blvd. Tucson, AZ 85710 New Fry’s Fuel Canopy (3rd Review) TRANSMITTAL DATE: 6/8/2026 The site is located in C-1 zone (UDC 4.7.20) and SR zone (4.7.4). General Merchandise Sales is a permitted use in the C-1 zone subject to Use Specific Standard 4.9.9.B.3 and 4.9.13.O (UDC Table 4.8-3). Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Site Zoning has reviewed the building plans for compliance with the associated Development Package (DP) TD-DEV-0225-00061. While it appears the building plans match the DP, Site zoning cannot approve this permit until the DP is approved by all review agencies. 2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 05/18/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |