Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-1225-02306
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/03/2026 | Commercial Building Standard | APPROVED | |||
| 07/14/2026 | Commercial Electrical Standard | APPROVED | |||
| 07/14/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 08/03/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/28/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | The heating and cooling load for Unit 1 (FC-1 and CU-1) is not shown. [Initial comment: Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for Unit 1 (FC-1 and CU-1). Reference: Sections R403.7and R503.1.2, IECC 2018 as amended by the City of Tucson.] If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov |
||
| 07/28/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Coordinate the drawings. A new 3” building drain connects to an existing 3” building drain on risers 5, 6, and 7/P3.1, but on P2.1, keynote #2 calls for the new 3” building drain to connect to an existing 4” building drain. [Initial comment: Verify the size of the existing first floor building drains shown in riser diagram, 6/P3.1. The plan drawings show 4” but the riser diagrams show 3” existing building drains. Reference: Section 107.2.1, IBC 2018.] If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov |
||
| 07/09/2026 | Addressing Validation | REVIEW COMPLETED | |||
| 07/09/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |