Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-1225-02296
Parcel: 10605096B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1225-02296
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/16/2026 Commercial Building Standard APPROVED
01/14/2026 Site Zoning Standard APPROVED
01/16/2026 Water - PDSD Standard APPROVED
12/22/2025 Site Engineering Standard NOT REQUIRED
01/16/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/16/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-1225-02296 (3655 N ORACLE RD Unit:UNIT 104 TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).



1. If the registrant is not a registered electrical engineer, the registrant must be qualified to perform such work per A.A.C. R4-30-302 and the electrical work must be incidental to the work of the registrant’s profession for the project per A.R.S. 32-143. (Incidental is defined as minor electrical work that is a result of the work of the registrant’s profession for the project).
a. The provided scope of work does not meet the definition of ‘incidental’.
2. Reference sheet 7, Electrical Notes. The code references are incorrect for the scope of work on a commercial project. Remove all references to the IRC. Show compliance with the 2017 National Electrical Code.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
01/16/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-1225-02296
ADDRESS/PARCEL: (3655 N ORACLE RD Unit:UNIT 104 TUCSON, AZ 85705)

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

COMMENTS:
1. The shower area does not show mechanical exhaust. Provide exhaust ventilation in accordance with IMC 2018, Section 403.3.1.1.
If you have any questions, I can be reached at sean.severson@tucsonaz.gov
01/16/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-1225-02296
ADDRESS/PARCEL: (3655 N ORACLE RD Unit:UNIT 104 TUCSON, AZ 85705)

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

COMMENTS:

1. New Shower
a. Provide shower valve that complies with the requirements of Section 412.3, IPC 2018.
b. Provide details showing how the floor of the shower is to be constructed in accordance with the requirements of 421.5, IPC 2018
2. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
3. Please clarify how the cold plunge tubs are filled, drained, and cleaned, and identify where drained water will be discharged. Reference: Section 107.2.1, IBC 2018.
If you have any questions, I can be reached at sean.severson@tucsonaz.gov
01/13/2026 Fire New Construction Standard REVIEW COMPLETED
12/22/2025 PDSD Application Completeness Express REVIEW COMPLETED