Permit Number: TC-COM-1225-02296
Parcel: 10605096B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1225-02296
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/03/2026 Commercial Electrical Standard APPROVED
03/05/2026 Commercial Mechanical Standard APPROVED
03/05/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT This permit will require resubmit due to the Revisions involving Tucson Fire. Please ensure Tucson Fire is involved in the next Review Cycle.
03/05/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-1225-02296
ADDRESS/PARCEL: (3655 N ORACLE RD Unit:UNIT 104 TUCSON, AZ 85705)

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. The cold plunge is considered a plumbing fixture and must be directly or indirectly connected to the potable water supply system. Also, it should either be directly connected to the sanitary drainage system or to grey water. Please revise the plans accordingly. Reference: Section 301.3 and 301.4, IPC 2018.
2. Previous comment not fully addressed [Provide details showing how the floor of the shower is to be constructed in accordance with the requirements of 421.5, IPC 2018.]
a. The plans only indicate mosaic tile for the shower floor. Per IPC Section 421.5, shower floors must be constructed with a watertight, impervious liner or membrane beneath the tile, properly sloped to the drain and installed per code. Please provide details of the shower pan waterproofing system, including type of liner or membrane, and connection to the drain. Reference: Section 421.5, IPC 2018.
3. Please provide details on how the chiller is interconnected with the cold plunge as well as the manufacturers specs for the cold plunge. Additionally, indicate the type of refrigerant used by the chiller. Reference: Section 107.2.1, IBC 2018.
4. Please also provide the manufacturers specs for the sauna. Reference: Section 107.2.1, IBC 2018.
03/02/2026 PDSD Application Completeness Express REVIEW COMPLETED