Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-1225-02244
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/04/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/04/2026 Commercial Building Standard REQUIRES RESUBMIT Thank You for your responses.
1. The mentioned floor drain is not reflected in the drawing. Please locate/label the location of this floor drain.
2. The vent/exhaust is nor reflected in the drawing. Please locate/label this on the drawing.
04/29/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-1225-02244
ADDRESS/PARCEL: (6924 E SPEEDWAY BL Unit:BLDG 3 UNIT 11 TUCSON, AZ 85710)
Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

Plumbing and Mechanical Comments:

1. Please show the existing floor drain on the plumbing waste floor plan that is referenced in Keynote 2. Reference: Section 413.2, IPC 2018.
2. Detail 200 and 201 are missing from sheet P1.0. Reference: Section 107.2.1, IBC 2018.
04/29/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-1225-02244
ADDRESS/PARCEL: (6924 E SPEEDWAY BL Unit:BLDG 3 UNIT 11 TUCSON, AZ 85710)
Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

Plumbing and Mechanical Comments:

1. Please show the existing floor drain on the plumbing waste floor plan that is referenced in Keynote 2. Reference: Section 413.2, IPC 2018.
2. Detail 200 and 201 are missing from sheet P1.0. Reference: Section 107.2.1, IBC 2018.
04/09/2026 PDSD Application Completeness Express REVIEW COMPLETED