Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1225-02230
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/31/2025 | Commercial Building Standard | APPROVED | |||
| 01/07/2026 | Site Zoning Standard | APPROVED | Approved with Master Plan Set TC-COM-1225-02222 | ||
| 01/07/2026 | Water - PDSD Standard | APPROVED | |||
| 12/16/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 01/07/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/07/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Clarify the Plumbing Fixture Schedule on P3-1.2. How is the “Surerack Xfire” involved in the replacement of the two water heaters? Is the circulation pump, CP-1, the same as the P-1 pumps shown in the water heater piping diagram on P2-2.1and plan 1/P3-1.2? 2. Are the water heaters, storage tanks, and pumps being replaced like-for-like? If not, provide details showing how any necessary modifications are to be made to the existing facility. Reference: Section 107.2.1, IBC 2018. 3. Provide data to show that the water heating equipment and the storage tanks meet the energy efficiency requirements shown in Table C404.2, IECC 2018. |
||
| 01/06/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | Shared Bluebeam in TC-COM-1225-02222 |