Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1225-02225
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/31/2025 | Commercial Building Standard | APPROVED | |||
| 01/07/2026 | Site Zoning Standard | APPROVED | Approved with Master Plan Set TC-COM-1225-02222 | ||
| 01/07/2026 | Water - PDSD Standard | APPROVED | |||
| 12/16/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 01/07/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/07/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. HDPE is not approved for use as a water service pipe. Reference: Section 605.3, IPC 2024. 2. If PEX tubing is used for water distribution, provide an approved method of disinfection that will not expose the PEX tubing to excessive levels of chlorine. Your report should contain a narrative of what water distribution system was tested, the method used to disinfect the water distribution system and the report of the bacteriological examination by a licensed testing laboratory. Reference: Sections 303.2 and 610.1, IPC 2024. |
||
| 01/02/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/16/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | Shared Bluebeam in TC-COM-1225-02222 |