Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-1225-02222
Parcel: 13323111D

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1225-02222
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/31/2025 Commercial Building Standard APPROVED
01/07/2026 Site Zoning Standard APPROVED Master Plan Set for: TC-COM-1225-02223; TC-COM-1225-02224; TC-COM-1225-02225; TC-COM-1225-02226; TC-COM-1225-02227; TC-COM-1225-02228; TC-COM-1225-02229; TC-COM-1225-02230; TC-COM-1225-02231; TC-COM-1225-02232; TC-COM-1225-02233
01/06/2026 Water - PDSD Standard APPROVED
12/16/2025 Site Engineering Standard NOT REQUIRED
01/07/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/06/2026 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Building A is noted as a type B building on A6-00 and P1-1.2 but is shown as a type A building on P2-1.2. What is the correct building type?
2. HDPE is not approved for use as a water service pipe. Reference: Section 605.3, IPC 2024.
3. If PEX tubing is used for water distribution, provide an approved method of disinfection that will not expose the PEX tubing to excessive levels of chlorine. Your report should contain a narrative of what water distribution system was tested, the method used to disinfect the water distribution system and the report of the bacteriological examination by a licensed testing laboratory. Reference: Sections 303.2 and 610.1, IPC 2024.
01/02/2026 Fire New Construction Standard REVIEW COMPLETED
12/15/2025 PDSD Application Completeness Express REVIEW COMPLETED