Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-1225-02217
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/20/2026 | Commercial Mechanical Standard | NOT REQUIRED | |||
| 11/20/2026 | Commercial Plumbing Standard | NOT REQUIRED | |||
| 11/03/2026 | Fire New Construction Standard | NOT REQUIRED | |||
| 11/16/2026 | Outdoor Lighting Standard | NOT REQUIRED | |||
| 11/03/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 11/19/2026 | Site Zoning Standard | NOT REQUIRED | |||
| 11/20/2026 | Water - PDSD Standard | NOT REQUIRED | |||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Post Review Express | PENDING ASSIGNMENT | |||
| 11/16/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1225-02217 (3350 E GRANT RD TUCSON, AZ 85716) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov 1. Modified plans must include an updated Seal by the Electrical Engineer or Record. Provide updated plans that include an updated Seal, signature and date by the EOR. 2. The line diagram shows equipment rated for 277/480V on a 120/208V system. Update the equipment for the new voltage or have the EOR approve the existing equipment/spec-sheets. 3. The maximum output current of the new Solis S5-GC60K-LV-US inverters is 166.5A. The existing AC Combiner Panel is showing only 100A OCPD for each inverter. Update the existing equipment and OCPD’s to match the new inverter output. 4. Update the Wiring and Conduit Schedule and calculations to correctly show the new voltage and current ratings of the inverters and total new PV current. Additional comment may be forthcoming with updated plans. |
||
| 10/29/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |