Permit Number: TC-COM-1225-02214
Parcel: 10706069C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1225-02214
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2026 Site Zoning Standard APPROVED
01/06/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/31/2025 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
1. Metal Building slab/footing design and calculations and construction drawings prepared by an Arizona licensed registrant must be submitted prior to the approval of this permit. IBC 107.2.1
2. Please amend the plan to show spaces with one exit or exit doorway are allowed 100 feet of egress travel for s occupancies with 30 or less occupants and adjust egress plan to show a reticular exit access egress path. IBC table 1006.2.1 and IBC 1017.3

Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
12/26/2025 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-1225-02214 (930 W GLENN ST Unit:BLDG 4 TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

Electrical Review:

Plans shall include (as necessary for scope of work), but may not be limited to items below:
1. Provide an electrical demo plan for any demo’ed electrical or appliances.
2. Provide an electrical line diagram showing how power gets from the Utility source, through the meter and to the 100A Sub Distribution Panel. Include ratings, sizes and types of each device, component or conductor in the line diagram.
3. Provide electrical load calculations, for the Main Panels, Per NEC 220.40, demonstrating the existing electrical system can support the additional load.
4. Provide Fault Current Analysis and show new equipment AIC rating sufficient to withstand the calculated Fault Current. Provide Available Fault Current calculations from TEP transformers to all new equipment, 2017 NEC 110.24.
5. Show new Panel’s and other new equipment with AIC ratings greater than or equal to the Available Fault Currents calculated, 2017 NEC 110.10.
6. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300 and 408.4.
7. Show all GFCI protection (NEC 210.8(B)) in readily accessible location per NEC 210.8.
8. Provide complete compliance with the 2018 IECC for the interior lighting, including sensors and lighting controls as required. (typically COMcheck).

Additional comments may be forthcoming with complete electrical plans for the building and site.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
01/05/2026 Commercial Mechanical Standard REQUIRES RESUBMIT ACTIVITY NO. TC-COM-1225-02214
ADDRESS/PARCEL: (930 W GLENN ST Unit:BLDG 4 TUCSON, AZ 85705)
Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

COMMENTS:

1. The airflow direction arrows shown near the outdoor air wall caps are incorrectly oriented. Please revise to show the correct airflow direction. Section 107.2.1, IBC 2018
2. The occupant load is not indicated in the outdoor air ventilation schedule. Please include the occupant load of 8 and revise the required outdoor air calculations accordingly. Section 403.3.1.1, IMC 2018.
3. The heat pump split system schedule lists the minimum outdoor air CFM as N/A. Please specify the required minimum outdoor air CFM.
4. Outdoor air wall caps are not shown on the elevation views (Sheet A1). Please add the wall caps to the elevations. Section 107.2.1, IBC 2018
5. Please clarify whether the existing roof-mounted turbine vents are intended to remain.
6. Please confirm that the proposed 7-inch diameter outdoor air duct is sized to provide the required outdoor air volume.
12/26/2025 Outdoor Lighting Standard REQUIRES RESUBMIT Outdoor Lighting Review TC-COM-1225-02214 (930 W GLENN ST Unit:BLDG 4 TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
Outdoor Lighting Review:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

a. The replacement, relocation and installation of new lighting fixtures requires compliance with the City of Tucson Outdoor Lighting Code.
b. Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan.
This will require all exterior lights to be shown on the site exterior lighting plan, including site and parking lot lights. >>> Note, Lighting Fixtures in the Outdoor Garden Center must be included in the Outdoor Lighting calculations and compliance.
c. List the Lighting Area per OLC (typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1.
d. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation.
e. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4.
f. Show lamps with a maximum of 3500K color temperature, OLC 402.1.
g. Provide the manufacturer’s specification sheets for the outdoor lighting fixtures. Include the lumen and color temperature values for each outdoor fixture type.
h. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2.

https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf

i. Specify any exceptions used.

j. Provide Curfew lighting controls If applicable Per section 403.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
12/12/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TC-COM-1225-02214 – Herman Warehouse
Location: 930 W GLENN ST Unit: BLDG 4
Review Date: 12/12/2025
Site Engineering Comments:
1. As this site was determined to experience regulatory flows during a 100-year storm event, a floodplain use (FPU) permit with elevation certificate will be required to be started prior to the approval for commercial permit TC-COM-1225-02214. It is understood that a FPU permit was submitted, and that was intended to cover the scope of site work in relation to the associated development package TD-DEV-0825-00221.
2. The FPU permit is a separate permit that can be submitted for within the sub-records of this commercial building permit on TDC online.
3. For the submission, provide all construction documents similar to what was provide within this commercial permit submission
Marco Contreras
Engineering Associate
Marco.contreras@tucsonaz.gov
01/02/2026 Fire New Construction Standard REVIEW COMPLETED
12/11/2025 PDSD Application Completeness Express REVIEW COMPLETED