Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1225-02199
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2026 | Commercial Building Standard | APPROVED | |||
| 01/06/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/23/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1225-02199 (10100 E OLD VAIL RD TUCSON, AZ 85747) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Show or notate GFCI protection as required by NEC 210.8(B)(2). 2. Show all GFCI protection (NEC 210.8(B)) in readily accessible location per NEC 210.8. 3. Provide electrical load calculations, for the Panel ‘B’, Per NEC 220.40, demonstrating the existing electrical system can support the additional load. 4. Provide panel equipment rated greater than the calculated load, NEC 408.30. The given load calculations exceed the rating of the bus for Panel ‘B’. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 01/02/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018. 2. Show that the walk-in cooler and the walk-in freezer meet the construction requirements of Section C403.10.2, IECC 2018. 3. Show that the walk-in cooler and the walk-in freezer meet the efficiency requirements of Section C403.10.2.1, IECC 2018. 4. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018 |
||
| 01/02/2026 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Notes on A140 refer to A100 and A110 for information regarding the overflow roof drain and the rainwater conductor. A100 is not part of the drawing set and A110 is for architectural floor plans. Where is the information located? Reference: Section 107.2.1, IBC 2018. 2. Clarify the termination of the primary roof drain conductors. Plumbing and Waste Plan Notes 20 and 21 on P110 call for connecting the primary roof drain conductors to a storm sewer. The civil utility drawings on the development package do not show the installation of a storm sewer. Reference: Section 107.2.1, IBC 2018. 3. The Gas Distribution Diagram on P100 and the Plumbing Fixture Schedule on P600 show a Gas Griddle (GR-1). Provide the gas load and the developed length from the meter for the griddle and show its location on the Plumbing Supply Plan. Reference: Section 402.1, IFGC 2018. 4. State the minimum gas pressure required for each appliance by the appliance manufacturer. Show how the gas pipe sizing calculations demonstrate conformance to Sections 402.1 and 402.3, IFGC 2018. 5. Clarify the specification for the temperature mixing valve, it shall be listed as conforming to ASSE 1070, not just ASSE 1016. Revise the specifications to note the correct ASSE standard so that an incorrect mixing valve is not substituted. Reference: Sections 416.5 and 607.1.2, IPC 2018. 6. Condensate drains shall be terminated at an approved disposal location. Draining the condensate onto the roof deck is not an approved disposal location. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. |
||
| 12/23/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Outdoor Lighting Review TC-COM-1225-02199 (10100 E OLD VAIL RD TUCSON, AZ 85747) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC). Outdoor Lighting Review: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf a. Provide an outdoor site lighting plan that meets the requirements of OLC 104.2. Show/locate the different light sources on your site plan. Number the light fixtures on your lighting fixture table and use the same number on your site plan. This will require all exterior lights to be shown on the site exterior lighting plan, including site and parking lot lights. b. List the Lighting Area per OLC (typically E3) chapter 3 and used in Table 401.1. Specify the compliance option from Table 401.1 that is being used. Total outdoor light output shall not exceed the lumen limits listed in Table 401.1. c. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 104.2.1, 401.2. Include all exterior fixtures on the property in the calculations. List shielded and unshielded lights in the calculation. d. Show unshielded fixtures with a maximum of 3,000 lumens, OLC 401.4. e. Show lamps with a maximum of 3500K color temperature, OLC 402.1. f. Provide the manufacturer’s specification sheets for the outdoor lighting fixtures. Include the lumen and color temperature values for each outdoor fixture type. g. Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf h. Specify any exceptions used. i. Provide Curfew lighting controls If applicable Per section 403. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 12/16/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-1225-02199 Location: 10100 E OLD VAIL RD Review Date: 12/16/2025 Site Engineering Comments: 1. Site Engineering is unable to review and approve permit TC-COM-1225-02199 until the associated Development Package TD-DEV-0725-00182 is reviewed and approved by all reviewers. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 01/06/2026 | Site Zoning Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-1225-02199 (Related TC-COM-1225-02185 Shell - TD-DEV-0725-00182) 10100 E OLD VAIL RD PAD-36 Tenant Improvement - (1st Review) TRANSMITTAL DATE: January 06, 2026 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Comment: Site Zoning has no comments at this time. Upon issuance of the related shell permit application (TC-COM-1225-02185), this permit application will be approved by Site Zoning. 2. Comment: Additional comments may be forthcoming based on the proposed use and applicable use specific standards. If you have any questions about this transmittal, please contact Ramiro Olivarez at Ramiro.Olivarez@tucsonaz.gov. |
||
| 12/30/2025 | Water - PDSD Standard | REQUIRES RESUBMIT | The plumbing supply plan on P100 shows the water meter and the backflow preventer, BFP-1 located within the building. Installation of the water meter is to be 3’ from the property line, in the right of way (see Tucson Water Standard Detail SD-309). Reduced pressure backflow prevention assemblies are required to be installed directly after the water meter for buildings that have food service facilities; outside, above ground, and on private property (see Tucson Water Standard Detail SD-1802). Refer to the civil utility plans for the location of the water meter and backflow preventer serving this building. https://www.tucsonaz.gov/Departments/Water/Contractors-Developers-and-Engineers/Tucson-Water-Standard-Specifications-and-Details | ||
| 12/31/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/09/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |