Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1225-02170
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/30/2025 | Site Zoning Standard | APPROVED | |||
| 12/05/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 12/30/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/22/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Provide the signed and sealed structural calculations, prepared by an Arizona licensed registrant, used in the design of this project. IBC 107.2.7 2. Please indicate any required special inspections for this project. For example, welding. 3. Please provide the ES report, manufacturer’s specifications for the liquid applied waterproof membrane used under the concrete topping slab and over the plywood sheathing, IBC 107.2.1 Additionally, please indicate special inspection is required and complete a special inspection form. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf 4. Please amend the plan to show the method used to provide ventilation beneath balcony or elevated walking surfaces. IBC 2304.12.2.6 For example, Enclosed framing in exterior balconies and elevated walking surfaces that are exposed to rain, snow or drainage from irrigation shall be provided with openings that provide a net free cross-ventilation area not less than 1/150 of the area of each separate space. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 12/26/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/04/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |