Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1224-02438
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/14/2025 | Commercial Electrical | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 1/10/2025 6:55:23 PM |
||
| 01/14/2025 | Commercial Mechanical | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 1/13/2025 9:30:20 AM |
||
| 01/14/2025 | Outdoor Lighting | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 1/10/2025 6:55:23 PM |
||
| 01/24/2025 | Site Zoning | APPROVED | |||
| 01/23/2025 | Water - PDSD | APPROVED | |||
| 01/27/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/14/2025 | Commercial Building | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 1/13/2025 2:22:02 PM 1. FIRM REGISTRATION: Per the Arizona Revised Statutes, Chapter 32, Rule 141, a firm shall not engage in the practice of any board-regulated profession or occupation unless the firm is registered with the board”. An active registration could not be found under the names "Haines Gipson & Associates" or "HGA" in the Arizona State Board of Technical Registration database: https://btr.az.gov/public/registered-firm-branch-search). Please confirm that the Engineer of Record has registered with the Board and update the title block to include a 5-digit Firm Registration number. For more information, see the following link: https://btr.az.gov/applicants/register-your-firmbranch 2. GENERAL - MECHANICAL UNITS: The HVAC Floor Plan, M1.0, and Mechanical Schedules, M2.0, reference new rooftop mechanical units each weighing between 900 and 2,900 lb. Please have the structural engineer of record coordinate locations and weights of these Mechanical units and verify that the existing roof framing is sufficient to support the proposed loads. If reinforcement of the existing framing is required or if new framing is needed below the proposed units, please provide a structural detail. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 1/14/2025 11:27:48 AM 1. General: Provide the Special Inspections Intermediate Certificate. A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. Part A & B need to be completed prior to Issuance. Part C to be completed prior to final Inspection. (2018 IBC Chapter 17) 2. Sheet G1.0: The cover sheet does not include an architect’s seal. (2018 IBC section 107) 3. Sheets G1.2: Include the exit signs along the means of egress. Some exit signs are included but others are missing from the life safety plans. Coordinate the exit sign locations with the electrical plans. (2018 IBC section 1013) 4. Sheet A2.0: Include the counter, table, and seating accessibility details. (2009 ICC A117.1 sections 902, 904) 5. Sheet A5.0: Provide the fenestration U-Factors. (2018 IECC section C402) |
||
| 01/14/2025 | Commercial Plumbing | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 1/5/2025 11:03:25 PM First Plumbing Review: 1). Plan Page P1.1: Coffee & Ice Makes can't share 1 backflow device. Add a separate backflow devices at ice maker & coffee machine. -2018 IPC 608.17.1.2 |
||
| 01/07/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 01/02/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 01/27/2025 | Site Engineering | REVIEW COMPLETED |