Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-1224-02427
Parcel: 133033950

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1224-02427
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/23/2025 Water - PDSD APPROVED 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433
01/23/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433
01/21/2025 Commercial Building REQUIRES RESUBMIT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433



Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 1/18/2025 10:15:01 PM
1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds.
Please provide a written response to each comment; updates without a clear response to all comments may not be
reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments.
2. GENERAL - GEOTECHNICAL REPORT: Please provide a copy of the site-specific geotechnical report referenced in the structural general notes. The report should support the appropriateness of the selected foundation system for the
project site. All submitted geotechnical reports must be dated no later than three years from the submittal date. Outdated reports must be accompanied by a letter from a qualified geotechnical engineer stating that the report requirements are still valid, or stating what items may have changed. All building code references must be updated to the current code adopted by the City.
3. SHEET S1.6 - CONFIRM HEADER SIZE: Per the Wood Header Schedule on Sheet S1.6, Header Type "H-2" shall be
(3) 6x12 built-up beam. This is an atypical beam size and will require a special detail to confirm how the three laminations are fastened together. Please confirm the design and resubmit.
4. SHEET S1.7 - DETAIL ILLEGIBLE: Due to the plot settings for Sheet S1.7, Detail 50/S1.6 is not legible. Please reprint this sheet and resubmit for review.
5. SHEET S5.1 - PARAPET DESIGN: The typical roof framing Details 301, 302 & 306 on Sheet S5.1 show the building parapet as a continuation of the 2x stud wall below. Detail 304 shows the parapet framing being built into the prefabricated roof truss (designed by others). Please amend these details to state the maximum parapet height that the walls have been designed for and the maximum parapet height that the truss manufacturer shall design for.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 1/21/2025 1:35:53 PM
01/21/2025 Commercial Electrical REQUIRES RESUBMIT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433


Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 1/15/2025 11:22:20 AM
1. E2.1 UNIT A1 & A1-TYPE A - ELECTRICAL PLANS: Comment only, Heat pump and fan coil units have oversized conductors for CB selection.
2. E2.2 UNIT B1 & B1 TYPE A - ELECTRICAL PLANS: Could not locate Keynote 4 on Unit B1 Type A.
3. E2.4 UNIT C1 - ELECTRICAL PLAN: Need to call out conductor sizes for Heat Pump CU-C2 and Fan oil unit FC-C2.
4. E3.1 SINGLE LINE DIAGRAMS: Main Meter Pak shall have a Main disconnect (Circuit breaker is suggested) for over
6 disconnects/units per NEC 230.71
5. E3.1 SINGLE LINE DIAGRAMS: Main Meter Pak shows all units with a 150 amp meter circuit breaker. However, some of the units have 125 A MLO panels. Need to upsize panels or reduce size of affected meter circuit breakers (or call out to reference details on this sheet)
6. E3.2 SINGLE LINE DIAGRAMS: Is missing from drawing set. Please confirm it has been removed or provided with next submittal.
01/21/2025 Commercial Mechanical REQUIRES RESUBMIT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 1/16/2025 2:37:12 PM
1. General - After researching the Manufacture website the refrigerant being used is flammable. This is not stated on the
Mechanical plans. This must be stated on the Mechanical plans (Type A2L refrigerant - R454B or R32). This
refrigerant is a A2L type refrigerant (flammable). Provide a detail of the refrigerant line encasement, shafts from the
AHU to the condenser for one and two story buildings. - 2018 IMC section 1107.3 Pipe enclosures. - 2018 IECC
Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction
documents.
2. General - Page 16 of Type C1 in the Heat Load Calculations - Unit type C1 states: Net Required: 2.61 Tons 31,334 BTUH. Plan Sheet M2.0 states in the Split System Heat Pump Schedule FC-C1: Total Cooling 24 MBH - 2 Tons. Confirm Heat Load and unit design for Unit C!. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents.
3. General - Plan Sheet M1.1 Detail #4 - Label all OA, Dryer and plumbing intakes and exhaust. Provide clear dimensions from intakes and exhaust. - 2018 IMC Section 501.3.1 Location of exhaust outlets.
4. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency is acceptable. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements.
01/21/2025 Commercial Plumbing REQUIRES RESUBMIT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 1/21/2025 6:55:57 PM
First Plumbing Review:
1). GENERAL PLUMBING PLANS: Work Scope states 2 of the buildings are 2 stories in height, none of sanitary or water piping configurations show riser diagrams that would correlate to a 2 story piping configuration. Add piping configurations for
the typical 2 story units. -2018 IPC 106.3.1
01/21/2025 Outdoor Lighting REQUIRES RESUBMIT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433


Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 1/15/2025 11:22:20 AM
1. E2.1 UNIT A1 & A1-TYPE A - ELECTRICAL PLANS: Comment only, Heat pump and fan coil units have oversized conductors for CB selection.
2. E2.2 UNIT B1 & B1 TYPE A - ELECTRICAL PLANS: Could not locate Keynote 4 on Unit B1 Type A.
3. E2.4 UNIT C1 - ELECTRICAL PLAN: Need to call out conductor sizes for Heat Pump CU-C2 and Fan oil unit FC-C2.
4. E3.1 SINGLE LINE DIAGRAMS: Main Meter Pak shall have a Main disconnect (Circuit breaker is suggested) for over
6 disconnects/units per NEC 230.71
5. E3.1 SINGLE LINE DIAGRAMS: Main Meter Pak shows all units with a 150 amp meter circuit breaker. However, some of the units have 125 A MLO panels. Need to upsize panels or reduce size of affected meter circuit breakers (or call out to reference details on this sheet)
6. E3.2 SINGLE LINE DIAGRAMS: Is missing from drawing set. Please confirm it has been removed or provided with next submittal.
01/23/2025 Site Engineering REQUIRES RESUBMIT 1. The associated development package TD-DEV-1224-00348 must be approved before any of the building permits for this development can be approved.

Mike Ortiz
michael.ortiz@tucsonaz.gov
01/21/2025 Site Zoning REQUIRES RESUBMIT 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433

FROM: PDSD Zoning Review Section

PROJECT: BLDG 1 = TC-COM-1224-02386, BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433 - TD-DEV-1224-00348
9575 E SPEEDWAY BL. - C-1
Multifamily (1st Review)

TRANSMITTAL DATE: ‎January 20, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in C-1 zone (UDC 4.7.20). Multifamily Use is a permitted use in the zone (UDC Table 4.8-4)

1. As Development Package (DP) TD-DEV-1224-00324 has not completed it’s 1st review Zoning will not review the building plans at this time and will review on the next submittal.

2. Until the DP is approved by all review agencies Zoning cannot approve the building plans.

3. The development package sheets provided in the building plan set either need to be the stamped approved plans, marked for reference only, or removed from the building set. If you elect to mark for reference only do not mark the utility plans and if you elect to remove the plans leave the utility plans in the so Plumbing can review.

4. Provide a detailed breakdown by building number with the number of each type unit and the square footage of each unit so that impact fee requirements for each building can be determined.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
12/31/2024 Fire New Construction REVIEW COMPLETED 20 PERMITS - MASTER SET OF PLANS ON BLDG 1 = TC-COM-1224-02386 WITH REVIEWS TO BE COMPLETED FOR BLDG 2 = TC-COM-1224-02410, BLDG 3 = TC-COM-1224-02412, BLDG 4 = TC-COM-1224-02413, BLDG 5 = TC-COM-1224-02415, BLDG 6 = TC-COM-1224-02417, BLDG 7 = TC-COM-1224-02418, BLDG 8 = TC-COM-1224-02420, BLDG 9 = TC-COM-1224-02421, BLDG 10 = TC-COM-1224-02422, BLDG 11 = TC-COM-1224-02424, BLDG 12 = TC-COM-1224-02425, BLDG 13 = TC-COM-1224-02426, BLDG 14 = TC-COM-1224-02427, BLDG 15 = TC-COM-1224-02428, BLDG 16 = TC-COM-1224-02429, BLDG 17 = TC-COM-1224-02430, BLDG 18 = TC-COM-1224-02431, BLDG 19 = TC-COM-1224-02432, BLDG 20 = TC-COM-1224-02433
12/31/2024 PDSD Application Completeness Express REVIEW COMPLETED