| 03/12/2025 | Site Zoning | APPROVED | |||
| 03/12/2025 | Commercial Mechanical | NOT REQUIRED | |||
| 03/12/2025 | Commercial Plumbing | NOT REQUIRED | |||
| 03/13/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/13/2025 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please amend the occupant load as the occupant load factor for Mercantile is 60square feet per person in the mercantile areas. IBC Table 1004.5 2. Please amend the plans to provide details of the new wall assemblies including the connections to the floor and ceiling, material used for framing, and interior surface covering. IBC 107.2.1 3. IEBC 305.7 requires that accessibility be provided to the altered spaces. Where the existing path of travel elements, which entails a primary entrance, a primary path of travel, sanitary facilities serving the area, a drinking fountain, and signs. Otherwise, accessibility upgrades shall be required in accordance with IEBC.305.7. 1. For example, the existing rest room does not have the required 5’ clearance from the wall to the lavatory. If the lavatory was moved a bit the clearance would be more compliant with 2009 ICC A117.1 604. If the cost of providing or upgrading the items above to be accessible is disproportionate to the cost of construction (exceeds 20% of the cost of construction not including accessibility upgrades), please provide information to verify construction costs. (A) Alterations made to provide an accessible path of travel to the altered area will be deemed disproportionate to the overall alteration when the cost exceeds 20% of the cost of the alteration to the primary function area. (B) Costs that may be counted as expenditures required to provide an accessible path of travel may include: For example, costs associated with making restrooms accessible, such as installing grab bars, enlarging toilet stalls, insulating pipes, or installing accessible faucet controls. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 03/04/2025 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-1224-02389 (9630 E 22ND ST TUCSON, AZ 85748) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Residential Code (IRC), 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide a complete electrical plan-set showing all proposed electrical work. 2. Should include but not be limited to: a. Provide a complete line diagram, NEC 110.2, 2018 IBC 107.1. b. Provide electrical load calculations, for the Main Service Panel, Per NEC 220.40. c. Show the location of the panel on the Electrical Plan with clear working space compliance, 2017 NEC 110.26(A). d. Provide a panel schedule showing the circuits that are being modified and added. e. Designate the circuit number, that corresponds to the panel schedule, at the location of each new or modified light fixture, receptacle, appliance, and equipment disconnect switch, NEC arts;300 and 408.4. f. Show all wiring methods in detail for all branch circuit wiring along with branch circuit and breaker panel designations and correlate with the panel schedules. NEC arts;300 and 408.4. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 02/27/2025 | Fire New Construction | REVIEW COMPLETED | Any fire sprinklers system alterations will required a separate submittal and permit. | ||
| 02/26/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |