Permit Number: TC-COM-1224-02368
Parcel: 11619201C

Address:
2 N FREEWAY

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1224-02368
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2025 Commercial Mechanical APPROVED Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 1/3/2025 12:57:58 PM
01/14/2025 Water - PDSD APPROVED
01/22/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/06/2025 Commercial Building REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 1/6/2025 4:42:06 PM
1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be
reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments.
2. GENERAL - FUEL CANOPY DRAWINGS: The CA- series drawings provided by RD Collaborative show plans and elevations for a proposed fuel canopy. The drawings refer to "Fuel Canopy Structural Drawings" for information on
steel member sizes, foundations and connections. Reviewer was unable to locate these drawings in the submitted set of documents. Please confirm and upload the structural fuel canopy drawings if required.
3. GENERAL - SPECIAL INSPECTIONS FOR FUEL CANOPIES: If fuel canopies are included in the scope of this permit, the structural general notes should be amended to include Special Inspections for structural steel as required
by the 2018 IBC Section 1705.2 and the AISC Manual 360 Chapter N.
4. GENERAL - GEOTECHNICAL REPORT: Please provide a copy of the site-specific geotechnical report referenced in the structural general notes. The report should support the appropriateness of the selected foundation system for the
project site. All submitted geotechnical reports must be dated no later than five years from the submittal date. Outdated reports must be accompanied by a letter from a qualified geotechnical engineer stating that the report
requirements are still valid, or stating what items may have changed. All building code references must be updated to the current code adopted by the City.
5. SHEET W-1.1 - SHEAR WALL SILL ANCHORAGE: Reviewer was unable to confirm the desired embed length for distributed sill plate anchors at SIP shear walls. Please confirm where this information has been provided and resubmit.
6. SHEET W-3.1 - MECHANICAL LOADS: The Roof Plan prepared by Pinnacle Engineering, Sheet W-3.1, lists weights for RTU's 1 and 2 that conflict with the recommendations provided by the Engineer of Record on Sheet S1.1. The
Engineer of Record is requesting for the prefabricated wood roof trusses be designed to support units weighing a maximum of 1,760 lb each. Please revise Sheet W-3.1 to be consistent with these recommendations.
7. SHEETS W-5.3 thru W-5.5 - CONFIRM PARAPET CONNECTIONS: Details 26, 32, 33 & 35 on Sheets W-5.3, W-5.4 and W-5.5 show proposed 2x4 and 2x6 kickers supporting parapet SIP panels in various conditions. In all cases,
kickers are secured by a combination of toe-nails into a continuous ledger and OSB sheathing that is fastened into these ledgers with nails at 6"oc. These kickers are anticipated to be loaded in both tension and compression,
depending on the direction of the wind. Please confirm that these connections have been checked for pull-out of the nails and are sufficient to resist wind in both directions. [Written confirmation from the engineer is required to satisfy
this comment. Please refer to the first comment above.]



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 12/26/2024 3:37:12 PM
1. General: Provide the Special Inspections Intermediate Certificate with parts A & B completed for verification of the approved Special Inspectors for the special inspections required. (2018 IBC section 1704.2.1, Required Tucson submittal requirements.)
2. Sheet G1.0: Specify if fire alarms are being installed. (2018 IBC section 107)
01/06/2025 Commercial Electrical REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 12/27/2024 6:40:01 PM
1. General comment: Many of the sheets have different names than what is shown on the coversheet sheet index. Correct/coordinate sheet index.
2. E1.1 ELECTRICAL SITE PHOTOMETRIC PLAN: is what is on sheet index, however, Correct Sheet name is ‘ELECTRICAL SITE PLAN DETAILS’. Comment applies to other sheets as well.
3. E1.2 EXTERIOR LIGHT FIXTURE CUT SHEETS: Sheet needs to be signed and sealed to accept the required Lumen Calculations summary (Tucson city code requires this exterior lighting calculation). Or move calculation to
prior sheet for approval such ie E1.1.
4. E6.1 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide.
5. E6.2 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide.
6. E7.0 PANEL SCHEDULES: All panels have incorrect ‘Spare Capacity Percent’ calculation.
7. E7.1 PANEL SCHEDULES: Fault current calculations look ok, but f and M values do not look correct. Recheck, because listed M values do not produce the Fault current values shown.
01/06/2025 Commercial Plumbing REQUIRES RESUBMIT Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 12/29/2024 10:07:24 PM
First Plumbing Review:
1). Plan Page A1.7: Missing Roof Drainage Method. Add roof drainage method with calculations. -2018 IPC 1101.2, 1106.1, 1106.2, 1106.3, 1106.6, 1108
2). Plan Page A1.7: Missing location of adjacent secondary scuppers. Add adjacent secondary scuppers. -2018 IPC 1106.5. 1108
3). Plan page P1.1: Roof drain calc table missing conductor information. Add conductor information to roof drainage calc table. -2018 IPC 1106.3
4). Plan Page P1.1: Missing location of adjacent secondary scuppers. Add adjacent secondary scuppers. -2018 IPC 1106.5. 1108
5). Plan page P1.1.1 detail 2: add note for indirect waste piping that exceeds distances listed in -2018 IPC 802.3 will need to be trapped.
6). Plan page P1.3: Water system detail is missing backflow protection for the H201 Oven water connection. Add backflow protection for the H201 Oven water connection. -2018 IPC 608.3
7). Plan pages P1.1.1 & P1.2: Grease laden waste needs to discharge to the grease system. The H201 Oven floor sink needs to connect to the grease system, -2018 IPC 1003.1
01/06/2025 Outdoor Lighting REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 12/27/2024 6:40:01 PM
1. General comment: Many of the sheets have different names than what is shown on the coversheet sheet index. Correct/coordinate sheet index.
2. E1.1 ELECTRICAL SITE PHOTOMETRIC PLAN: is what is on sheet index, however, Correct Sheet name is ‘ELECTRICAL SITE PLAN DETAILS’. Comment applies to other sheets as well.
3. E1.2 EXTERIOR LIGHT FIXTURE CUT SHEETS: Sheet needs to be signed and sealed to accept the required Lumen Calculations summary (Tucson city code requires this exterior lighting calculation). Or move calculation to
prior sheet for approval such ie E1.1.
4. E6.1 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide.
5. E6.2 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide.
6. E7.0 PANEL SCHEDULES: All panels have incorrect ‘Spare Capacity Percent’ calculation.
7. E7.1 PANEL SCHEDULES: Fault current calculations look ok, but f and M values do not look correct. Recheck, because listed M values do not produce the Fault current values shown.
01/14/2025 Site Engineering REQUIRES RESUBMIT TC-COM-1224-02368
2 N FREEWAY

Site engineering comments are as follows:

This building permit, TC-COM-1224-02368, cannot be approved until the associated Development Package, TD-DEV-0723-00337, is approved by all reviewers.

Please raise the accessible parking signage to a minimum of 84in above grade in pedestrian areas. TSM 7-01.9.0_Fig. 3.

Ryan Insalaco - ryan.insalaco@tucsonaz.gov
01/16/2025 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL
FROM: Fernando Garcia Planning & Development Services Department – Zoning Review Section
PROJECT: TC-COM-1224-02368 – Commercial Building (ref. TD-DEV-0723-00337)
Plan Review (1st Review)
TRANSMITTAL DATE: January 16, 2025
This site is zoned I-1 and C-3. Retail Use Group – General Merchandise Sales (Fuel Station) is a permitted use in these zones.
1. (Comment) Although the plans appears to match, final Site Zoning approval of this plan cannot occur until development package, TD-DEV-0723-00337, is approved. Once approved, please resubmit the building permit. Ensure the building permit documents match the approved development package if any changes to the DP are made.
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approval of TD-DEV-0723-00337 and resubmittal of revised plans. If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov.
01/22/2025 Design Review REVIEW COMPLETED Plans consistent with approved design package SD-0524-00046 on October 23, 2024
01/08/2025 Fire New Construction REVIEW COMPLETED The following items apply to the proposed project:
1. Fuel tanks required a separate submittal and permit
2. A Flammable and Combustible Operational Permit is required
For both of the above permit's please contact jesus.silva@tucsonaz.gov
3. A construction and Operational permit is require for the Co2 system.
4. Fire extinguishers shall be installed at the store and fuel canopy as required per the 2024 OIFC Section 906
12/23/2024 PDSD Application Completeness Express REVIEW COMPLETED