Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1224-02368
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2025 | Commercial Mechanical | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 1/3/2025 12:57:58 PM |
||
| 01/14/2025 | Water - PDSD | APPROVED | |||
| 01/22/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/06/2025 | Commercial Building | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 1/6/2025 4:42:06 PM 1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments. 2. GENERAL - FUEL CANOPY DRAWINGS: The CA- series drawings provided by RD Collaborative show plans and elevations for a proposed fuel canopy. The drawings refer to "Fuel Canopy Structural Drawings" for information on steel member sizes, foundations and connections. Reviewer was unable to locate these drawings in the submitted set of documents. Please confirm and upload the structural fuel canopy drawings if required. 3. GENERAL - SPECIAL INSPECTIONS FOR FUEL CANOPIES: If fuel canopies are included in the scope of this permit, the structural general notes should be amended to include Special Inspections for structural steel as required by the 2018 IBC Section 1705.2 and the AISC Manual 360 Chapter N. 4. GENERAL - GEOTECHNICAL REPORT: Please provide a copy of the site-specific geotechnical report referenced in the structural general notes. The report should support the appropriateness of the selected foundation system for the project site. All submitted geotechnical reports must be dated no later than five years from the submittal date. Outdated reports must be accompanied by a letter from a qualified geotechnical engineer stating that the report requirements are still valid, or stating what items may have changed. All building code references must be updated to the current code adopted by the City. 5. SHEET W-1.1 - SHEAR WALL SILL ANCHORAGE: Reviewer was unable to confirm the desired embed length for distributed sill plate anchors at SIP shear walls. Please confirm where this information has been provided and resubmit. 6. SHEET W-3.1 - MECHANICAL LOADS: The Roof Plan prepared by Pinnacle Engineering, Sheet W-3.1, lists weights for RTU's 1 and 2 that conflict with the recommendations provided by the Engineer of Record on Sheet S1.1. The Engineer of Record is requesting for the prefabricated wood roof trusses be designed to support units weighing a maximum of 1,760 lb each. Please revise Sheet W-3.1 to be consistent with these recommendations. 7. SHEETS W-5.3 thru W-5.5 - CONFIRM PARAPET CONNECTIONS: Details 26, 32, 33 & 35 on Sheets W-5.3, W-5.4 and W-5.5 show proposed 2x4 and 2x6 kickers supporting parapet SIP panels in various conditions. In all cases, kickers are secured by a combination of toe-nails into a continuous ledger and OSB sheathing that is fastened into these ledgers with nails at 6"oc. These kickers are anticipated to be loaded in both tension and compression, depending on the direction of the wind. Please confirm that these connections have been checked for pull-out of the nails and are sufficient to resist wind in both directions. [Written confirmation from the engineer is required to satisfy this comment. Please refer to the first comment above.] Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 12/26/2024 3:37:12 PM 1. General: Provide the Special Inspections Intermediate Certificate with parts A & B completed for verification of the approved Special Inspectors for the special inspections required. (2018 IBC section 1704.2.1, Required Tucson submittal requirements.) 2. Sheet G1.0: Specify if fire alarms are being installed. (2018 IBC section 107) |
||
| 01/06/2025 | Commercial Electrical | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 12/27/2024 6:40:01 PM 1. General comment: Many of the sheets have different names than what is shown on the coversheet sheet index. Correct/coordinate sheet index. 2. E1.1 ELECTRICAL SITE PHOTOMETRIC PLAN: is what is on sheet index, however, Correct Sheet name is ‘ELECTRICAL SITE PLAN DETAILS’. Comment applies to other sheets as well. 3. E1.2 EXTERIOR LIGHT FIXTURE CUT SHEETS: Sheet needs to be signed and sealed to accept the required Lumen Calculations summary (Tucson city code requires this exterior lighting calculation). Or move calculation to prior sheet for approval such ie E1.1. 4. E6.1 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide. 5. E6.2 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide. 6. E7.0 PANEL SCHEDULES: All panels have incorrect ‘Spare Capacity Percent’ calculation. 7. E7.1 PANEL SCHEDULES: Fault current calculations look ok, but f and M values do not look correct. Recheck, because listed M values do not produce the Fault current values shown. |
||
| 01/06/2025 | Commercial Plumbing | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 12/29/2024 10:07:24 PM First Plumbing Review: 1). Plan Page A1.7: Missing Roof Drainage Method. Add roof drainage method with calculations. -2018 IPC 1101.2, 1106.1, 1106.2, 1106.3, 1106.6, 1108 2). Plan Page A1.7: Missing location of adjacent secondary scuppers. Add adjacent secondary scuppers. -2018 IPC 1106.5. 1108 3). Plan page P1.1: Roof drain calc table missing conductor information. Add conductor information to roof drainage calc table. -2018 IPC 1106.3 4). Plan Page P1.1: Missing location of adjacent secondary scuppers. Add adjacent secondary scuppers. -2018 IPC 1106.5. 1108 5). Plan page P1.1.1 detail 2: add note for indirect waste piping that exceeds distances listed in -2018 IPC 802.3 will need to be trapped. 6). Plan page P1.3: Water system detail is missing backflow protection for the H201 Oven water connection. Add backflow protection for the H201 Oven water connection. -2018 IPC 608.3 7). Plan pages P1.1.1 & P1.2: Grease laden waste needs to discharge to the grease system. The H201 Oven floor sink needs to connect to the grease system, -2018 IPC 1003.1 |
||
| 01/06/2025 | Outdoor Lighting | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 12/27/2024 6:40:01 PM 1. General comment: Many of the sheets have different names than what is shown on the coversheet sheet index. Correct/coordinate sheet index. 2. E1.1 ELECTRICAL SITE PHOTOMETRIC PLAN: is what is on sheet index, however, Correct Sheet name is ‘ELECTRICAL SITE PLAN DETAILS’. Comment applies to other sheets as well. 3. E1.2 EXTERIOR LIGHT FIXTURE CUT SHEETS: Sheet needs to be signed and sealed to accept the required Lumen Calculations summary (Tucson city code requires this exterior lighting calculation). Or move calculation to prior sheet for approval such ie E1.1. 4. E6.1 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide. 5. E6.2 VENDOR EQUIPMENT DRAWINGS: Missing sheet, confirm deleted or provide. 6. E7.0 PANEL SCHEDULES: All panels have incorrect ‘Spare Capacity Percent’ calculation. 7. E7.1 PANEL SCHEDULES: Fault current calculations look ok, but f and M values do not look correct. Recheck, because listed M values do not produce the Fault current values shown. |
||
| 01/14/2025 | Site Engineering | REQUIRES RESUBMIT | TC-COM-1224-02368 2 N FREEWAY Site engineering comments are as follows: This building permit, TC-COM-1224-02368, cannot be approved until the associated Development Package, TD-DEV-0723-00337, is approved by all reviewers. Please raise the accessible parking signage to a minimum of 84in above grade in pedestrian areas. TSM 7-01.9.0_Fig. 3. Ryan Insalaco - ryan.insalaco@tucsonaz.gov |
||
| 01/16/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Fernando Garcia Planning & Development Services Department – Zoning Review Section PROJECT: TC-COM-1224-02368 – Commercial Building (ref. TD-DEV-0723-00337) Plan Review (1st Review) TRANSMITTAL DATE: January 16, 2025 This site is zoned I-1 and C-3. Retail Use Group – General Merchandise Sales (Fuel Station) is a permitted use in these zones. 1. (Comment) Although the plans appears to match, final Site Zoning approval of this plan cannot occur until development package, TD-DEV-0723-00337, is approved. Once approved, please resubmit the building permit. Ensure the building permit documents match the approved development package if any changes to the DP are made. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approval of TD-DEV-0723-00337 and resubmittal of revised plans. If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov. |
||
| 01/22/2025 | Design Review | REVIEW COMPLETED | Plans consistent with approved design package SD-0524-00046 on October 23, 2024 | ||
| 01/08/2025 | Fire New Construction | REVIEW COMPLETED | The following items apply to the proposed project: 1. Fuel tanks required a separate submittal and permit 2. A Flammable and Combustible Operational Permit is required For both of the above permit's please contact jesus.silva@tucsonaz.gov 3. A construction and Operational permit is require for the Co2 system. 4. Fire extinguishers shall be installed at the store and fuel canopy as required per the 2024 OIFC Section 906 |
||
| 12/23/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |