Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-1224-02335
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/26/2024 | Commercial Building | APPROVED | |||
| 12/31/2024 | Commercial Electrical | APPROVED | |||
| 01/07/2025 | Site Zoning | APPROVED | |||
| 12/31/2024 | Site Engineering | NOT REQUIRED | |||
| 01/07/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/31/2024 | Commercial Mechanical | REQUIRES RESUBMIT | General notes 11 through 14 on sheet A-2 deal with possible revisions to the mechanical units located on the roof and the Health Dept Notes on sheet A-0 includes references to Type I and Type II hoods. Clarify the extent of any mechanical work that is part of this activity and remove any extraneous notes. Reference: Section 107.2.1, IBC 2018. | ||
| 12/31/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2018, for mercantile occupancy (i.e., drinking fountain). Reference: Section 410, IPC 2018. 2. Provide a detail showing how the proposed tankless water heater will be installed. Reference: Section 303.2, IPC 2018. 3. Provide specifications for all proposed plumbing fixtures, equipment, and products. All proposed plumbing products and materials shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018. 4. Provide for sterilization and testing of the domestic water system per Section 610.1, IPC 2018. 5. Revise the size of the drain pipes per Sections 709.1 and 709.2, IPC 2018. 6. Clarify the intended use of the proposed 3-compartment sink (e.g., utensil and dishwashing, food handling, or a combination of both). Show how the drains of the 3-compartment sink will discharge to the proposed floor sink. Reference: Sections 802.1.1 and 802.1.7, IPC 2018. 7. Provide an indirect connection for the water trough using an air break or an air gap. Reference: Sections 802.1.5, IPC 2018. |
||
| 12/20/2024 | Fire New Construction | REQUIRES RESUBMIT | -Verify if building is sprinklered. If sprinklered, it would not be ESFR sprinklers. Correct the sprinkler notes in code data, sheet T1. john.vincent@tucsonaz.gov 5203495581 |
||
| 12/31/2024 | Water - PDSD | REQUIRES RESUBMIT | Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. | ||
| 12/18/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |