Permit Number: TC-COM-1224-02307
Parcel: 128010510

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1224-02307
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/26/2024 Commercial Electrical APPROVED Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 12/17/2024 11:41:33 AM
1. E1 could not locate Coded Note #18.
2. E2 could not locate Coded Notes #14 and 15.
12/26/2024 Commercial Plumbing APPROVED Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Approved
Reason:
Date Completed : 12/15/2024 3:59:51 PM
FIRST PLUMBING REVIEW: OK
01/14/2025 Site Engineering APPROVED
01/10/2025 Site Zoning APPROVED
01/14/2025 Water - PDSD APPROVED
01/14/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/26/2024 Commercial Building REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 12/26/2024 3:44:08 PM
1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be
reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments.
2. SHEET D1.0 - The Architectural Demolition Plan, Sheet D1.0, calls out two existing columns to be removed. The plan note states that the removal shall be "Coordinated with Structural". Refer to Gridlines A-C/9-10 on Sheet D1.0.
Reviewer was unable to find any information on these columns in the structural construction documents. Please confirm the overall scope of work and determine if any additional structural evaluation is required prior to removing
these columns. Written confirmation in the form of a Revision Narrative is required to resolve this comment.
3. SHEET S1.1 - CONFLICTING INFORMATION: The Roof Framing Plan Note #6 on Sheet S1.1 appears to give design information that conflicts with Detail 2/S2.0. Please confirm the maximum overall size of new openings in the existing
CMU wall (20"x20" or 24"x24") and the minimum required lintel size (L4x4x1/4 per Sheet S1.1 or L6x6x3/8 per Sheet S2.0). Detail 2/S2.0 should be modified to indicate the minimum length of the proposed lintel, as the lintel is shown
extending beyond the opening by an unlabeled amount.




Building(B) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Denied
Reason:
Date Completed : 12/18/2024 8:26:36 AM
1. Provide Special Inspections Intermediate Certificate
◦ A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. Provide signed/dated certificate: S0.0a lists code required special inspection and materials testing program.
You may obtain the form at the following link: ◦https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-developmentservices/documents/special_inspection_certificate.pdf
◦ The Condition is added to the permit and then satisfied upon approval of the form.
2. Sheet A1.0 – Architectural floor plan does not show vestibules per 2018 IECC section C402.5.7. Building entrances shall be protected with an enclosed vestibule, with all doors opening into and out of the vestibule equipped with selfclosing devices. Site and explain exceptions when applicable.
3. X1.0 – Show total travel distance to exit from the abandoned space 121. Door and window indicate potential occupancy.
4. X1.0 – Show the hall way width into men’s fitting room 106 and ADA turn clearance at the change of direction. Appears to provide 60” diameter turn radius once in the room but unclear how wheel chair can turn at the prior right
angle hallway. Similar issue at office hall 119. Show hallway width: how ADA access into manager’s office 104 which indicates 60” diameter maneuvering clearance.
12/26/2024 Commercial Mechanical REQUIRES RESUBMIT Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 12/17/2024 11:45:13 AM
1. General - Provide Heat Load Calculations. Show all O/A loads on calculations. - 2018 IECC Section
C403.1.1 Calculation of heating and cooling loads. - 2018 IECC Section C103.2Information on construction
documents.
12/31/2024 Fire New Construction REVIEW COMPLETED
12/16/2024 PDSD Application Completeness Express REVIEW COMPLETED