Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.5
Permit Number - TC-COM-1223-02960
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/09/2025 | Commercial Plumbing | REQUIRES RESUBMIT | 1. The specified tankless water heater serving the lavatories is designed for serving a whole house, not two lavatories. [Second comment: See water heater detail, sheet A2. Note: install per manufacturer’s instructions (e.g. expansion tank not required). [Initial comment: The International Plumbing Code, 2018, is the controlling code for this activity, not the 2012 International Plumbing Code. Replace all references to the IRC code sections with the appropriate sections of the 2018 IPC and the 2018 IECC. Reference: Section 101.2, IPC 2018.] 2. Comment not resolved. Provide a minimum of two drinking fountains; one accessible for standing persons and one accessible for persons confined to a wheelchair. Reference: Section 410.3, IPC 2018 (see also exception 1, Section 410.3, IPC 2018). Note that the specified “drinking fountain” is actually a recessed ceiling light! [Second comment: Provide a minimum of two drinking fountains; one accessible for standing persons and one accessible for persons confined to a wheelchair. Reference: Section 410.3, IPC 2018 (see also exception 1, Section 410.3, IPC 2018).] [Initial comment: Provide the number of drinking fountains that complies with the requirements of Sections 2902.1 and 2902.5, IBC 2018 and Section 410.3, IPC 2018.] 3. Comment not addressed. [Second comment: Comment not addressed.] [Initial comment: Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018.] 4. A general note of, “Location to comply with Section C404.5, IECC 2018” is not acceptable. State the distance requirement , e.g., 24” from the hot water source to the lavatory connection for ½” pipe.[Second comment: Provide a note on the drawing for the installer of the water heater.] [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.] |
||
| 12/09/2025 | Water - PDSD | REQUIRES RESUBMIT | 1. Verify the size of the existing water meter: Tucson Water data shows that a 5/8” water meter is installed. Revise the site plan call-out from “backwater valve” to “backflow preventer”. Verify the size of the water service to the building, the site plan shows it as ¾” and as 1”. [Third comment: Comment not resolved. Provide the size of the existing water meter and the backflow preventor. Revise the site plan call-out from “backwater valve” to “backflow preventer.”] [Second comment: Comment not resolved. Provide the size of the water meter, the size of the backflow preventer, and the size of the water service pipe. (Note: A backwater valve is used in the building sewer to prevent backflow of the sewage.)] [Initial comment: Show the location and size of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.] 2. Comment not addressed [Third comment: Comment not addressed.] [Second comment: Comment not resolved. The IPC allows the use of approved calculation methods to determine the water demand and size the water distribution pipes. What method are you using and what is the calculated demand. The method must be for commercial installations and include all of the proposed plumbing fixtures.] [Initial comment: Provide the proposed water demand to be served by the existing water meter. Reference: Section 107.2.1, IBC 2018.] |
||
| 12/04/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |