Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.6
Permit Number - TC-COM-1223-02960
Review Name: COMMERCIAL REVIEW - FULL v.6
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/01/2026 | Commercial Plumbing | APPROVED | |||
| 04/01/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/01/2026 | Water - PDSD | REQUIRES RESUBMIT | The response states that the meter size is to be ¾” but it is still shown as 5/8”. Verify the size of the water service. It is still shown as ¾” outside and 1” inside. The water calculations show a demand of approximately 21 GPM; the ¾” water service pipe is too small (velocity greater than 8 FPS). The backflow preventer is still labelled as a backwater valve. [Fourth comment: Verify the size of the existing water meter: Tucson Water data shows that a 5/8” water meter is installed. Revise the site plan call-out from “backwater valve” to “backflow preventer”. Verify the size of the water service to the building, the site plan shows it as ¾” and as 1”.] [Third comment: Comment not resolved. Provide the size of the existing water meter and the backflow preventor. Revise the site plan call-out from “backwater valve” to “backflow preventer.”] [Second comment: Comment not resolved. Provide the size of the water meter, the size of the backflow preventer, and the size of the water service pipe. (Note: A backwater valve is used in the building sewer to prevent backflow of the sewage.)] [Initial comment: Show the location and size of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.] If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov |
||
| 03/19/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |