Permit Number: TC-COM-1223-02960
Parcel: 125091430

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-1223-02960
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/17/2025 Commercial Structural APPROVED
04/14/2025 Site Zoning APPROVED
04/17/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/02/2025 Commercial Electrical REQUIRES RESUBMIT Commercial Electrical Review TC-COM-1223-02960 (2855 E BROADWAY BL TUCSON, AZ 85716)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).


1. Clarify water heaters and heat pumps shown on the Panel ‘A’ Schedule. Clearly designate the location and circuit numbers for each heat pump and water heater on the electrical plan.
2. None of the circuits shown for the water heaters or heat pumps are the correct size breaker or conductors per the spec sheets for the tankless water heater, as specified in the plumbing plans,

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
04/17/2025 Commercial Mechanical REQUIRES RESUBMIT Revise the operation of the new restroom exhaust fans to operate continuously during the hours of operation of the business. The minimum exhaust air flowrate is 50 CFM foe each fan. Reference: Sections 401.3 and 403.3.1.1, IMC 2018.
04/17/2025 Commercial Plumbing REQUIRES RESUBMIT 1. See water heater detail, sheet A2. Note: install per manufacturer’s instructions (e.g. expansion tank not required). [Initial comment: The International Plumbing Code, 2018, is the controlling code for this activity, not the 2012 International Plumbing Code. Replace all references to the IRC code sections with the appropriate sections of the 2018 IPC and the 2018 IECC. Reference: Section 101.2, IPC 2018.]
2. The specified lavatory faucets are not metering faucets. [Initial comment: Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.]
3. Provide a minimum of two drinking fountains; one accessible for standing persons and one accessible for persons confined to a wheelchair. Reference: Section 410.3, IPC 2018 (see also exception 1, Section 410.3, IPC 2018). [Initial comment: Provide the number of drinking fountains that complies with the requirements of Sections 2902.1 and 2902.5, IBC 2018 and Section 410.3, IPC 2018.]
4. Comment not addressed. [Initial comment: Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018.]
5. Provide a note on the drawing for the installer of the water heater. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.]
04/17/2025 Water - PDSD REQUIRES RESUBMIT Comment not resolved. Provide the size of the existing water meter and the backflow preventer. Revise the site plan call-out from “backwater valve” to “backflow preventer.” [Second comment: Comment not resolved. Provide the size of the water meter, the size of the backflow preventer, and the size of the water service pipe. (Note: A backwater valve is used in the building sewer to prevent backflow of the sewage.)] [Initial comment: Show the location and size of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.]
04/09/2025 Fire New Construction REVIEW COMPLETED
04/01/2025 PDSD Application Completeness Express REVIEW COMPLETED