Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-1223-02911
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/12/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/10/2024 | Site Engineering | REQUIRES RESUBMIT | The building permit cannot be approved until the associated development package, TD-DEV-1223-00489, has been approved. Lianne Evans lianne.evans@tucsonaz.gov |
||
| 04/10/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: Wyatt Berger Lead Planner PROJECT: TC-COM-1223-02911 135 East Speedway Boulevard – C-2 Food Service (2nd Review) TRANSMITTAL DATE: April 10, 2024 Please resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed. 1. Zoning has reviewed the building plans for compliance with the associated development package TD-DEV-1223-00489. Although it appears the building plan footprint and square footage are consistent with the submitted development package, Zoning cannot approve TC-COM-1223-02911 until the development package is approved by all reviewers. 2. The building height provided on TD-DEV-1223-00489 is 19 feet and does not match the elevation drawings. Ensure the building height provided on the development package matches the elevation drawings. If you have any questions about this transmittal, contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. |
||
| 04/12/2024 | Water - PDSD | REQUIRES RESUBMIT | Include civil sheet 5 0f 14, utilities + easements plan, as part of the building plan set. The development package is only good for grading and paving. The construction of site utilities (e.g. water service and building sewer) must be part of the building plan set. [Initial comment: Provide the civil plans showing the installation of the water service to the building as part of the building plan set. Reference: Sections 107.2.1 and 107.2.6, IBC 2018.] | ||
| 03/14/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |