Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1223-02911
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/07/2025 | Water - PDSD Standard | APPROVED | |||
| 03/10/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/14/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 2/14/2025 2:25:47 AM 1. Provide Special Inspections Intermediate Certificate ◦ A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. Provide signed/dated certificate: S0.0 lists code required for special inspection and materials testing program. ◦ You may obtain the form at the following link: ◦ https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-developmentservices/documents/special_inspection_certificate.pdf ◦ The Condition is added to the permit and then satisfied upon approval of the form. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 2/14/2025 2:28:17 AM 1. Sheet A3.1 – Detail 5 shows foundation vent well detail but missing under-floor ventilation calculation per 2018 IBC section 1202.4. |
||
| 02/14/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 2/14/2025 2:26:36 AM 1. Sheet E1.2 – Electrical riser diagram is not showing disconnects. 2017 NEC section 230.70 states means shall be provided to disconnect all conductors in a building or other structure from the service-entrance conductors. 2. Sheet E1.2 – P1 panelboard schedule shows AMPS capacity of 225 but electrical load summary shows service size of 400-amp. P2 panelboard schedule shows AMPS capacity of 225 AMPS but electrical load summary shows service size of 400-amp. |
||
| 02/14/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 2/14/2025 2:26:12 AM 1. Sheet A7.1 – Cooler roof plan missing with secondary drain per 2018 IBC section 1502.2 and roof drainage calculation similar to provide in A2.1. |
||
| 03/10/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. see zoning comments about the need for a revised Development Package. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 03/06/2025 | Site Zoning Standard | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-1223-02911 135 E SPEEDWAY BL. – C-2 Food Service (Revision 1st Review) TRANSMITTAL: March 6, 2025 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in C-2 zone (UDC 4.7.21), Food Service is a permitted use in the zone subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P. 1. As you are adding square footage, increased the size of the cooler and added dry storage, a revision to Development Package (DP) TD-DEV-1223-00489 will need to be submitted and approved. 2. The development package sheets provided in the building plan set either need to be the stamped approved development package sheets, marked for reference only, or removed from the building set. If you elect to mark for reference only do not mark the utility plans and if you elect to remove the plans leave the utility plans in the so Plumbing can review. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 02/25/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |