Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1223-02911
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/24/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/24/2024 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 12/29/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-1223-02911 135 E SPEEDWAY BL. – C-2 Food Service (1st Review) TRANSMITTAL: December 29, 2023 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in C-2 zone (UDC 4.7.21), Food Service is a permitted use in the zone subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P. 1. As Development Package (DP) TD-DEV-1223-00489 has not yet been accepted for review and completed the 1st review Zoning cannot compare the plans for compliance with each other. Zoning will review the building plans on the next submittal. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 01/23/2024 | Water - PDSD | REQUIRES RESUBMIT | 1. Provide the civil plans showing the installation of the water service to the building as part of the building plan set. Reference: Sections 107.2.1 and 107.2.6, IBC 2018. 2. Clarify the purpose of BFP1(detail 6/M1.1). Is it meant to be installed in addition to or instead of the reduced pressure zone backflow assembly shown on the civil plans? Reduced pressure backflow prevention assemblies meant to protect the municipal water supply are required to be installed in locations accessible to Tucson Water (i.e. as shown on the civil plans). Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf 3. Provide the water demand calculations for this building. Reference Section 107.2.1, IBC 2018. 4. Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2018. |
||
| 12/28/2023 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 12/28/2023 10:07:58 AM Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 12/28/2023 10:08:33 AM Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 12/28/2023 10:08:18 AM Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 12/28/2023 10:08:25 AM Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 12/28/2023 10:08:11 AM |
||
| 12/29/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 12/26/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |