Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1223-02903
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/27/2023 | Site Zoning | APPROVED | |||
01/23/2024 | Site Engineering | NOT REQUIRED | |||
01/23/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/09/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 1/4/2024 2:02:25 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 12/29/2023 10:12:33 PM 1. General: No occupant load calculations provided. Provide a detailed existing and new occupant load calculation in accordance with 2018 IBC Section 1004. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 1/3/2024 1:27:17 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 1/4/2024 9:05:22 AM ELECTRICAL REVIEW OF KROGER BY: RON ROSS PE Approved with comments for electrical ED1.2 POWER DEMOLITION PLAN: Could not locate Keynote 4 E1.3 ELECTRICAL POWER PLAN: Missing numerous Keynotes. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 1/7/2024 11:30:23 PM First Plumbing Review: 1)., Need to address Building plan review comment 1 -IPC 403.1 2). Lavatories on P6.1 Fixture schedule needs ASSE 1070 mixing valves- IPC 419.5 3). DW-1 in bakery on plan page P1.1 needs to discharge to the grease system. -Tucson Plumbing code amendments |
||
12/27/2023 | Fire New Construction | REVIEW COMPLETED | |||
12/22/2023 | PDSD Application Completeness | REVIEW COMPLETED | |||
01/22/2024 | Water - PDSD | REVIEW COMPLETED |